Industrial training logbook

Day 63 Internship at Forest City

Day 63 Internship at Forest City

9am

  1. Visit P26 site region
  • Check the water pressure, the pressure is maintained at 10 bar
  • Check all the sewerage manholes along P26 and make sure inside is clean and do not have rocks/sands
  • Inform the contractor to fix the bricks surrounding the manholes
  • Check the sewerage manholes at STP2 and found out they are covered with gravel layer
  • Inform the surveyor to check the location of manhole and dig it out as PDC7-1 will be launched later

2pm

  1. Visit P26 site region
  • The PDC7-1 test is passed

         2. Attend the weekly meeting

         3. Visit P26 site region

  • The water pressure test from SAJ is passed
  • Inform the contractor to do the connection tomorrow and flushing process

6pm

  • Off from work