Day 60 Internship at Forest City
by BOO WEN HAO
Day 60 Internship at Forest City
9am
- Visit P26 site region
- Check the water pressure
- The water pressure is 9 bar which is slightly decrease
- Inform the contractor the circumstances and urge to meet with SAJ PIC for water pressure test
- Inform the contractor to sand backfilling the part where crossroad power supply pipe exposed
- Take pictures and inform the contractor to cut the reinforced steelĀ
2pm
- Visit P26 site region
- Received news from contractor that already arrange meeting with SAJ PIC tomorrow morning
- Check the sewage manhole and inform the contractor to elevate the height of manhole for 30cm
- Inform the contractor can start do the recycle water pipe
6pm
- Off from work