Industrial training logbook

Day 59 Internship at Forest City

Day 59 Internship at Forest City

9am

  1. Visit P26 site region
  • Check the water pressure of DN700mm MSCL pipe
  • The pressure reading is 10 bar and appropriate
  • Meet with the STP3 contractor to discuss the route of vent tube
  • The contractor will complete the vent tube construction by tonight
  • Inform the contractor to cut the concrete bars which could exist possible safety problem

2pm

  1. Visit P4 site region
  • Check the street lamp foundation installation

         2. Visit P26 site region

  • Check the water pressure reading

6pm

  • Off from work