Day 59 Internship at Forest City
by BOO WEN HAO
Day 59 Internship at Forest City
9am
- Visit P26 site region
- Check the water pressure of DN700mm MSCL pipe
- The pressure reading is 10 bar and appropriate
- Meet with the STP3 contractor to discuss the route of vent tube
- The contractor will complete the vent tube construction by tonight
- Inform the contractor to cut the concrete bars which could exist possible safety problem
2pm
- Visit P4 site region
- Check the street lamp foundation installation
2. Visit P26 site region
- Check the water pressure reading
6pm
- Off from work