Day 26 Internship at Forest City
by BOO WEN HAO
Day 26 Internship at Forest City
9am
- Receive task from supervisor to check the road boundary lines and municipal infrastructure red line then make sure there are enough space for integrated pipeline network
- Visit P26 site region
- Meet the contractor who responsible for constructing the road and drainage piping
- Check the road boundary lines and compare with the design drawings
- Measure the distance between the road boundary line and drainage piping
- P26 front and middle part are satisfied with the design drawing
- P26 rear end are not satisfied with the design drawing
- Will conduct a meeting with all contractor and have a short visit on P26 region and put all the visible markings to prevent mistakes
- Realise the importance of coordination between different contractor before construction
2pm
- Visit P26 site region
- Go with supervisor and meet the road and bridge department, road contractor and pipeline contractor
- Discuss about the construction of integrated pipeline network based on the design drawings
- The road contractor does mistake and required to redo again as it dig the wrong trenches according to the design drawings
- At the P26 rear end, there is insufficient space for the low-voltage power supply pipeline as the drainage pipe is on progress
- Discuss with all related contractor and come out with appropriate solutions
- The main problem is the well consume a lot of available space
- Decide to move the drainage inside abit so there is sufficient space for the construction of low-voltage power supply pipeline
- Inform the contractor to complete the high-voltage power supply pipeline at P26 rear end today
- Remind them to solve the safety and housekeeping problems to prevent further penalty
- Given task by supervisor that required to check the boundary lines again and again
6pm
- Off from work