Day 21 Internship at Forest City
by BOO WEN HAO
Day 21 Internship at Forest City
9am
- Visit the site for integrated piping network at golf
- To check the condition of soil along the bridge whether it is favourable for construction process
- Between R01 and R02 bridge, the soil condition is satisfied as just require some sand filling to ease the construction
- Between R02 and R03 bridge, the soil condition is unsatisfied as the soil is soft and sludge, so exist subsidence problem
- To solve this issue, it requires making pile using Caisson construction method
- Between R03 and R04 bridge, the soil condition is quite satisfied but require mudstone to build the foundation for construction process
- Take some photos that could added in the presentation slides
2. Visit the site for power supply
- Supervise the construction process to make sure the making trenches process is ongoing without delay
2pm
- The weekly progress presentation is postponed
- Visit the golf site
- Check the progress
- Inform the contractor to stop the construction tomorrow as the chairman of Country Garden will come and attend wedding ceremony held in Golf
5pm
- Back to office
- Continue doing the research on the related pipeline materials
- Jot down some important notes
6pm
- Off from work