Day 22 Internship at Forest City
by BOO WEN HAO
Day 22 Internship at Forest City
9am
- Follow my supervisor to go P26 site
- Require to do work memo
- Understand the construction progress of P26
- Take photos that could added into the work memo
- For P26 front end, the well for water supply not properly covered by contractor
- The materials for other contractor are not moved and block the route for construction of integrated pipeline network
- Contact the contractor to help remove the items in order to ease our construction
- For P26 middle, the equipment is ready and start digging the trenches for DN1000 water supply pipe
- Coordinate with the contractor to put the barricade lines for construction
- Found out problem, the well is not properly constructed at the right place, as located cross the red line
- Contact the contractor to allocate the well which should be within the red line
- Also inform the contractor to use the equipment to break the road structure in order to dig trenches
5. What the contractor company should do after on-site visit
- Self inspection
- Strong coordination and management
- Standard working procedure
- Efficient and effective communication
2pm
- Attend the meeting between head director, contractor and supervisor to discuss about the construction at P26
- Visit P26 site
- For P26 middle, part of the water supply pipe is installed and connected followed by sand backfilling process
- Inform the contractor to speed up the backfilling process in order to open road ensure smooth flow of vehicle for project department
- There is a part that have problem on the design drawing
- Group up the road and bridge department, contractor, resources department to discuss about the solutions
- Already come out with solutions after coordination and communication
- Gain more knowledge about the integrated pipeline network from supervisor by asking questions
- Take photos for added in the work memo
6pm
- Off from work