Day 52 Internship at Forest City
by BOO WEN HAO
Day 52 Internship at Forest City
9am
- Visit P26 site region
- All sewage pipe had come and delivered on-site
- Urge the contractor to make sure complete all the sewage pipe route along P26 by today
- Check the crossover water and power supply pipe at front end of P26
- Already send the pictures to SAJ and waiting further notice
- Inform the contractor to check all the pressure gauge as SAJ might come for inspection by this week
- Check the location of valve wall together with small municipal contractor (SMC)
2. Visit P52 site region
- Meet with the small municipal to discuss about the crossroad power supply pipe which didn't appear on the large municipal design drawings
- Decide to let our contractor to do the crossroad pipe
- Write work memo to inform contractor to complete it by today as have to minimize the damage on the road foundation
2pm
- At office
- Write work memo about penalty regarding to the work checklist signed by contractor
3pm
- Visit P26 site region
- Check the sewage pipe construction progress
2. Visit P52 site region
- Check the crossroad power supply pipe construction progress
6pm
- Off from work