9am

  1. Visit sites for checking the progress
  • Visit P-4 region
  • Evacuate the parking vehicles and fencing the barricade line in order to start the construction work
  • Using the heavy vehicles to break the ground
  • Using the excavator to dig out the sand and stones in order to make a 10m depth holes for placing the power supply piping
  1. The water supply pipe still exist problems as the water pressure still unable to reach 15bar, the water pressure reach till 10bar and drop back to zero
  • Having short discussion with the contractor and come out with possible solutions
  • Difficult to identify the leakage as the water leaks out combine easily with sand
  • Having more trials by pumping the water pressure

2pm

  1. Visit P-53 regions
  • Checking the progress with contractor
  • Pave back the sand and clay by using backhoe after making sure the power supply, drainage, and sewage water treatment piping are installled properly
  1. Visit Phoenix Hotel Golf Resort
  • Having a glance on the completed project by Country Garden
  • Meeting the manager of Phoenix Hotel Golf Resort
  • Discuss the problem of massive eletricity consumption and being charged for a very high amount of bills
  1. Visit P-55 regions
  • Meet the contractor and urge the process
  • Discuss together about the position of placing the well which used to connect the water supply, and sewage treatment pipe
  • Using level instrument to calculate the appropriate reduced level
  • Mark the position for making a 5m depth holes by using spray cans
  • Urge the contractor to speed up the progress