Day 3 Internship at Forest City
by BOO WEN HAO
Day 3 Internship at Forest City
9am
- Visit sites for checking the progress
- Visit P-4 region
- Evacuate the parking vehicles and fencing the barricade line in order to start the construction work
- Using the heavy vehicles to break the ground
- Using the excavator to dig out the sand and stones in order to make a 10m depth holes for placing the power supply piping
- The water supply pipe still exist problems as the water pressure still unable to reach 15bar, the water pressure reach till 10bar and drop back to zero
- Having short discussion with the contractor and come out with possible solutions
- Difficult to identify the leakage as the water leaks out combine easily with sand
- Having more trials by pumping the water pressure
2pm
- Visit P-53 regions
- Checking the progress with contractor
- Pave back the sand and clay by using backhoe after making sure the power supply, drainage, and sewage water treatment piping are installled properly
- Visit Phoenix Hotel Golf Resort
- Having a glance on the completed project by Country Garden
- Meeting the manager of Phoenix Hotel Golf Resort
- Discuss the problem of massive eletricity consumption and being charged for a very high amount of bills
- Visit P-55 regions
- Meet the contractor and urge the process
- Discuss together about the position of placing the well which used to connect the water supply, and sewage treatment pipe
- Using level instrument to calculate the appropriate reduced level
- Mark the position for making a 5m depth holes by using spray cans
- Urge the contractor to speed up the progress
6pm
- Off from work