9am
- Visit golf site as happens emergency situation during late night Saturday
- Other contractor company cause damage on the 11kV main power supply pipe line when doing construction works
- However, there are danger signs provided and we did inform the contractor to be more careful
- Department will implement monetary punishment on the contractor company
- The golf hotel is facing power outage
- The golf hotel forced to buy diesel to run electricity generator in order to supply the temporary power supply
- This solution is not long lasting, as the generator need to rest 20minutes after operating for 24 hours
2. Visit site to observe the seriousness of the problem
- The pipe is damaged but already suit the remedies to the case by reconnecting the power supply pipe using cold welding
- Asking TNB to re-operate the electric panel but cannot function, so there must still exist defects
- Asking person in charge come to site to trace back the location where defects happen
3. Visit site where location amendment of water supply and power supply
- Current situation need to rush these construction works as the generator solution cannot rush long
- Urge the contractor who responsible for water supply piping to speed up the progress then only power supply piping can be initiated
- Meet with power supply piping contractor to use the pipe jacking method at the place in front of golf hotel
1pm
- Re-visit the damaged piping location
- Already trace the defects and apply cold welding on the damaged parts
- Re-connect the damaged power supply piping
- Require to do the testing
2. Supervisor suspects that the power supply wrong connection could happens as they might connect to that abandoned power supply line
- They connect the abandoned power supply line and that's why it is still not function
- Identify the correct piping and apply the cold welding for reconnnection
- Awaiting TNB staffs come to site to switch on the electric panel that require for testing
3. Visit site where location amendment of water supply and power supply
- Check the progress
- The water supply piping is placed into the grooved digged
- Need to apply sand backfilling
- The water supply piping can be completed today
- The power supply piping materials and machines are already standby at the site
- The piping work can be started by tomorrow
6pm
- Off from work