9am
- Visit the 33kV stesen suis utama at Gelang Patah
- Check the specific location of ring main unit (RMU)
- Check the connections of power supply cables route
2. Back to office
- Doing some research on the underground piping system
- Given task by supervisor : Study on the construction regulations in Malaysia
2pm
- Doing research on
- Pile making (types and its advantages)
- Pipe trenching process
- Pipe jacking and its advantages
- Pipe connection method (welding fusion, eletrofusion) and its advantges
- Suitable pipe materials for certain pipe (electrical, sewage, drainage, water supply)
- Horizontal Directional Drilling (HDD) and its advantages
- Construction process of integrated pipeline network used in Malaysia
6pm
- Off from work