Industrial training logbook

Day 57 Internship at Forest City

Day 57 Internship at Forest City

9am

  1. Visit P26 site region
  • The water pressure inspection test application letter already submitted to SAJ
  • Due to Haji, it is estimated to launch the test during next Sunday
  • Inform contractor to do the self testing for water pressure

WeChat Image_20180823133614.jpg

  • The machine is ready and inspect the water pressure

       2. Visit P4 site region

  • The street lamp foundation can be planted after confirming with road contractor

WeChat Image_20180823134001.jpg

       3. Visit International School region

  • Leakage problem happens again
  • Check the connection and found out the problem is due to the stone blocks the valve
  • Take equipment and fix the leakage problem

 

2pm

  1. Visit P26 site region
  • Meet with small municipal contractor to discuss the cross structure of pipes problems
  • Discuss according to design drawings
  • Come out with solutions that break the completed Elv pipe at first to allow the drainage box culvert pass through
  • Small municipal contractor promise to recover the Elv pipe after the box culvert is completed
  • At STP3, there happens small municipal contractor discharge the dosmetic sewage water into STP3 Inlet Chamber
  • The excessive sewage water submerge the Inlet chamber and flow into Screen Chamber
  • This incident cause the STP3 construction forced to postpone and require to clean the chamber
  • Write work memo to project department to warn the above action and the charge for cleaning will be charged on project department

6pm

  • Off from work