Day 39 Internship at Forest City
by BOO WEN HAO
Day 39 Internship at Forest City
9am
Visit International School region
Meet with the landscape department to discuss about the protruding manhole
2. Visit P26 site region
Check the progress for sewage piping construction
On-site management person have sick and absent today
3. Visit P52 site region
Check the progress for sewage snorkel
Inform the contractor to install the PVC pipe first in order to not affect the progress for constructing road foundation
4. Visit P4 site region
Meet with road contractor as there is one manhole located within the road boundary line as there is acceleration lane
Discuss according to the design drawing
Discuss the available solutions
2pm
Visit P26 site region
Check the progress for sewage pipe construction
Urge the contractor and coordinate
2. Visit P4 site region
Meet with the contractor and together find the Design Studio to discuss the manhole problem
The final solution is to move the manhole behind the acceleration lane and in the same time dig out front and back part of pipes for manhole then place the pipe deeper in order to prevent the road foundation construction
Inform the contractor to try complete within two days
3. Visit P52 site region
Check according to the design drawing
The end of Elv routing should be ended with a manhole
Inform the contractor to complete the one manhole within today
6pm
Off from work