Industrial training logbook

Day 39 Internship at Forest City

Day 39 Internship at Forest City 9am Visit International School region Meet with the landscape department to discuss about the protruding manhole 2. Visit P26 site region Check the progress for sewage piping construction On-site management person have sick and absent today 3. Visit P52 site region Check the progress for sewage snorkel Inform the contractor to install the PVC pipe first in order to not affect the progress for constructing road foundation 4. Visit P4 site region Meet with road contractor as there is one manhole located within the road boundary line as there is acceleration lane Discuss according to the design drawing Discuss the available solutions 2pm Visit P26 site region Check the progress for sewage pipe construction Urge the contractor and coordinate 2. Visit P4 site region Meet with the contractor and together find the Design Studio to discuss the manhole problem The final solution is to move the manhole behind the acceleration lane and in the same time dig out front and back part of pipes for manhole then place the pipe deeper in order to prevent the road foundation construction Inform the contractor to try complete within two days 3. Visit P52 site region Check according to the design drawing The end of Elv routing should be ended with a manhole Inform the contractor to complete the one manhole within today 6pm Off from work