Day 36 Internship at Forest City
by BOO WEN HAO
Day 36 Internship at Forest City
9am
- Visit International School region
- 2 manholes are completed and already inform the landscape department to do the final restoration work
- Discuss with the landscape department to fix the protruding manhole about 10cm by using the soil to raise the surfaces of grass turfing
2. Visit P4 site region
- Still left 4 manhole not being chisel hole
- Contractor still facing short manpower
- Meet the contractor boss and bring him walk around P4 and see how bad the circumstances is
- Urge the boss to come out with effective solutions as already affect others from doing work
2pm
- Meet with the contractor responsible for street lamp construction
- Discuss according to the design drawing
- Request the road contractor to mark the midpoint for roundabout
- Estimate this weekend can start construct the foundation for street lamp
2. Visit P4 site region
- Check the progress
3. Visit P26 site region
- Check the progress for sewage pipe
- Check the crossroad piping for water supply
4. Visit P52 site region
- Check the progress for DN150 water supply pipe
6pm
- Off from work