9am

  1. Visit P52 site region
  • Check the sewage snorkel construction progress and the Elv routing manhole
  • The sewage snorkel is completed
  • The manhole is incomplete and inform the contractor to complete it by today

         2. Visit P26 site region

  • Check the sewage pipe construction progress
  • Check the Elv pipe construction progress
  • Coordinate the road contractor to verify whether the sewage pipe is constructed at the right place

         3. Visit P4 site region

  • Check the progress for location amendment of Electrical manhole
  • Inform the contractor to make the amendment fast in order not to affect road contractor to construct road foundation

2pm

  1. Visit P26 site region
  • Check the sewage pipe construction progress
  • Self inspection on the sewage pipe location using measuring tape according to design drawing
  • Check the Elv pipe construction progress
  • Elv routing complete but only left manhole haven't placed
  • Inform the contractor to install the manhole

         2. Visit P4 site region

  • There is another manhole placed in the acceleration lane
  • Need to fix the location of the manhole again
  • Inform the contractor come and discuss the solutions
  • Change the concrete manhole into cast iron manhole
  • Inform the contractor try to fix these few days as don't want to affect road contractor doing road foundation

6pm

  • Off from work