9am

  1. Visit P26 site region
  • All the labor, machine, equipment are ready
  • Proceed the road closure
  • Start the crossroad sewage pipe (DN900) construction
  • SAJ inspection on P26 water supply pipe launched by today
  • Join along with supervisor and SAJ Ranhill authorities to inspect the air pressure test

IMG20180811150013.jpg

2pm

  1. Visit P26 site region
  • Check the progress for crossroad sewage piping
  • Confirm with contractor that make sure complete by today
  • Help supervisor to check those pipes haven't sand backfilling
  • SAJ Ranhill left some comments on the water supply pipe inspection

6pm

  • Off from work