Industrial training logbook

Day 53 Internship at Forest City

Day 53 Internship at Forest City

9am

  1. Visit P26 site region
  • Check the sewage pipe construction progress
  • Contractor promise to complete the sewage pipe along P26 by today
  • Write penalty for delay of sewage pipe construction
  • SAJ come for inspection on the pressure gauge by 11am
  • Check all the pressure gauge along P26 together with supervisor
  • The inspection is postponed to 2pm

2pm

  1. Visit P26 site region
  • Check the pressure gauge of DN700 water supply pipe along P26 together with SAJ
  • The inspection is successful and passed the pressure test
  • Continue supervise the sewage pipe construction
  • Plan the construction planning for crossover pipe as involving road closure problem
  • Require to further inform and discuss with related department

6pm

  • Off from work