Industrial training logbook

Day 58 Internship at Forest City

Day 58 Internship at Forest City

9am

  1. Visit P26 site region
  • The water pressure is pumped up to 5bar
  • After reaching 10bar, check all the valves along DN700mm MSCL pipe and make sure is in good condition then keep on pumping
  • Inform all project department and contractor in P26 to be careful and not causing damage on the water pipe
  • Have a short visit along P26 with head director and road and bridge manager
  • Discuss with the project department about the building materials removal matters as already affect the completion time of road foundation

2pm

  1. Attend the weekly meeting
  • Paperwork management
  • P29-32 design drawings on site verification and red line boundaries marking
  • Water and power supply comprehensive backup plan
  • Golf water supply volume and Forest City water pressure
  • Golf Hotel water pump
  • P26 northern region water system project bidding

6pm

  • Off from work