9am
- Visit P26 site region
- The water pressure is pumped up to 5bar
- After reaching 10bar, check all the valves along DN700mm MSCL pipe and make sure is in good condition then keep on pumping
- Inform all project department and contractor in P26 to be careful and not causing damage on the water pipe
- Have a short visit along P26 with head director and road and bridge manager
- Discuss with the project department about the building materials removal matters as already affect the completion time of road foundation
2pm
- Attend the weekly meeting
- Paperwork management
- P29-32 design drawings on site verification and red line boundaries marking
- Water and power supply comprehensive backup plan
- Golf water supply volume and Forest City water pressure
- Golf Hotel water pump
- P26 northern region water system project bidding
6pm