2/8/2018
Today Mr Hazwan (M&E engineer) taught me autocad drawing command. Proposed electric pole position need to be clearly shown in construction drawing. I've also learned that TNB have minimum voltage loss limit, depending on the voltage. Voltage loss can be solved by manipulating the cable size and type.
3/8/2018
Attended price negotiation meeting with SEP subcontractor.