Week 10 part 2

16/8/2018

Documentation work

  • Autocad drawing update 
  • Reminder letter to LKSB
  • Request for information(RFI) to consultant

17/8/2018

Discussion with consultant regarding parapet design

  • J bolt at bridge for street lighting are too long, footing are protruding under parapet.
  • Propose L bolt to be used at bridge.
  • Issue Request for Information(RFI) to consultant regarding usage of L bolt. 

18/8/2018

Site walk to Jalan Bukit belacan (Ampang interchange) with M&E team. The objective of the site walk are to determine suitable location for piloting work, piloting location identifying process are based on: 

  • location of utilities based on drawing
  • alignment of the future road
  • availability of space for machinery
  • Traffic diversion availability

Amend autcad drawing based on piloting work previously done at Jalan bukit belacan. Based on the drawing, relocation plan of the involved utilities can be planned.

Piloting location decided

Details