16/8/2018
Documentation work
- Autocad drawing update
- Reminder letter to LKSB
- Request for information(RFI) to consultant
17/8/2018
Discussion with consultant regarding parapet design
- J bolt at bridge for street lighting are too long, footing are protruding under parapet.
- Propose L bolt to be used at bridge.
- Issue Request for Information(RFI) to consultant regarding usage of L bolt.
18/8/2018
Site walk to Jalan Bukit belacan (Ampang interchange) with M&E team. The objective of the site walk are to determine suitable location for piloting work, piloting location identifying process are based on:
- location of utilities based on drawing
- alignment of the future road
- availability of space for machinery
- Traffic diversion availability
Amend autcad drawing based on piloting work previously done at Jalan bukit belacan. Based on the drawing, relocation plan of the involved utilities can be planned.