WEEK 7 : 30 AUGUST - 5 SEPTEMBER 2020
Num. |
Date |
Day | Log/Activity |
1 | 30-08-2020 | Sunday |
-N/A- |
2 | 31-08-2020 | Monday | -N/A- |
3 | 01-09-2020 | Tuesday |
ACTIVITY (1) 8 am Have been taken this project seriously, so i did my best on doing my part very best. Since last week i been doing the tracing for the turtle and since then i cannot finish overall layer within the perfect time.
(2) 1.50 pm
Done the overall layer. Each layer is numbered and has special holes for easy positioning of the layers and easier assembly of the finished product.
This step is continuous from first layer until 14th layer.
|
4 | 02-09-2020 | Wednesday |
ACTIVITY Upon arrival, i directly edit some part that need to be edit before run the machine. At 10.50 am, I planned on combining the upper part (shell) of the turtle first and then continue for the rest. The upper part (shell) consist of five layer.
|
5 |
03-09-2020 |
Thursday |
ACTIVITY (1) 8 am Still on my first task which is grill panel. Edit the third grill panel on simulation for machining. (2) 9.30 am I did on machining the last grill panel and clean up the dusk/burr.
(3) 1.40 pm I started on machining the turtle. I planned to machine the upper part of the turtle which is the shell of the turtle. There are all five layer. Before that, I make sure:
Example of the result.
|
6 |
04-09-2020 |
Friday |
ACTIVITY Still have flaws on previous machining, so i decided to make a new one for N part and O part. N part and O part is the last two part of sofa.
After lunch hour, i started back setting for a turtle. Continue for the last part which is the body part. There are overall 7 layer more.
Around 4 pm, i was done all the part. This done exactly at 6 pm. That is mean, i was working for extra hour.
|
7 |
05-09-2020 |
Saturday |
ACTIVITY (1) 8 am From early morning, i edited for sofa part in the Ucancam. Include :
Start machining around 10 am. After finish machining, i started to clean up the dust from the surface of the board, switch on vacuum to suck the dust and sweep the floor. Around 1 pm, Fisa and i decided to work extra hours. We working together to machine for spacer. There are overall 600 spacers include 3mm mdf and 6mm white foam. This takes around 1 hour and 45 minutes to complete all the spacer. But then, that was only Fisa's spacer. I could not continue machining my part as the time showed 2.45 pm. Then, we decided to stop working and continue on Monday.
|