Week 8 (6/9/2020 - 12/9/2020)
7/9/2020 (Monday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL tang before 9:00am.
- After that, I analysed data from last week’s performance along with Kak Ida and Kak Nurul.
- After lunch break, I went to MCOB A Department to meet with Mr Shazni.
- Mr Shazni handed me BATES and ALLORO PCB to be measured.
- I created new program for both PCBs.
- The data obtained were gathered and presented in table and graphical form using Microsoft Office Excell.
8/9/2020 (Tuesday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL tang before 9:00am.
- Mr KL assigned me with a new task.
- This task required me to go to MCOB A Department and check on the utilisation of the tablet at the Sawing Process Line.
- I went to the production line and inspected the operator.
- I asked around about the tablet and took note on the issue that caused them not to use the tablet.
- The major issue happened to be the slow Internet connection.
- I updated the IT Department about this issue.
- After lunch break, Muizz from the IT Department went to MCOB A Department with me.
- He checked the Internet connection on each tablet.
- Somehow, it happened to be that those tablets has unknown ID making the IT Department block their Internet connections.
- Therefore, Muizz unblocked all the connections.
- I tried using the tablet by myself to experience and understand the utilisation myself.
- Since the Internet connection is okay now, the operator might be able to use the tablet to transact lots after this.
9/9/2020 (Wednesday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:00am.
- Then, I helped Kak Ida and Kak Nurul on the SMT Reject Breakdown.
- After lunch break, Mr KL Tang assigned me with two minor tasks.
- First, he wanted me to take photos on each type of jigs available and used in both SMT and MCOB Department.
- To solve this task, I went to the process flow for both department and identify which process utilise the jig.
- After that, I went straight to the processes that uses jigs mainly to perform their work.
- I took photos and explained the differences of each jig to Mr KL Tang.
- This task was given to follow the issue regarding PCB scratches.
- For the second task, Mr KL asked me and Kak Ida to observe the whole process of edge removal in MCOB A Department.
- We were asked to examine and study the tool used to carry this process. Thus, we analysed if this tool could contribute to PCB scratches.
10/9/2020 (Thursday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:00am.
- Then, I went to meet Mr Shazni in the MCOB A Department.
- Mr Shazni handed me four PCBs to be measured: SIDURI, HANZELL, RAGMAN and DESMOND.
- I created the program for each product.
- However, I only managed to complete 2 programs before lunch break and decided to continue with this task after lunch break.
- After lunch break, I went to the OGP Machine again to continue this morning’s task.
- Before that, Mr Shazni asked me to help him out on something more important.
- He asked me to measure a DODGE PCB that has misalignment.
- Along with that, he asked me to teach his internship trainee on how to use the machine.
- I taught the trainee to develop the program specifically for the DODGE problem.
- The data were collected and analysed with Microsoft Office Excel.
- Then, Mr Shazni said that there was another prioritised issue going on and need me to do some measurement regarding the issue.
- He handed me a magazine of 4 BATES panels to be measured.
- There panels were done with the laser-marking process.
- The issue is that, after laser-mark, there was misalignment problem.
- Therefore, I have to measure the position of the laser marks and the position of the PCB. Thus, I can comare the data to find the difference in the position later.
- The program for the panel took me around 30 minutes to develop and the running time for each panel was around 1 hour and 30 minutes per panel.
- Therefore, I was only able to complete one panel.
- By the end of the day, I was left with 3 panels of BATES, RAGMAN and HANZELL PCB to be measured tomorrow.
11/9/2020 (Friday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:00am.
- After that, I went to the OGP Machine to continue yesterday’s measurement.
- I completed the measurement for 1 BATES PCB.
- After lunch break, I continued with the measurement.
- I completed the measurement for another 2 BATES PCBs.
- Then, I created the program to measure RAGMAN and HANZELL.
- After completing all measurements that were due this week, I went to the office for data analysis.
- I tried my best to arrange and analyse the data accordingly. Then, I sent them all to Mr Shazni: the 4 PCB issues and the 4 BATES Panel issue.
- After that, ST Chin came to ask for some help on measuring.
- She asked me to develop a program to measure the difference in solder paste and PCB of the new product, BONAPARTE.
- I went to OGP Machine and created the program as requested.
- I tried out a few trials on the PCB before handling the program to her.