Week 12 (4/10/2020 - 10/10/2020)
5/10/2020 (Monday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:30am.
- Then, Mr KL Tang assigned me on another minor task.
- I was asked to go to the store to take some ESD equipment.
- He also asked me to help him find a magazine to be handed to a vendor name David.
- In order to bring out any Inari property from the company, a property pass is required. Thus, I learnt to do a property pass with Kak Ida.
- I also learnt to communicate with outside vendors and decided that he will come to take this magazine tomorrow.
- After lunch break, I helped Kak Nurul on the cycle time.
- I gathered all the data for last week’s lots and started the analyses as usual.
- Then, the data were displayed in a presentation slide form.
6/10/2020 (Tuesday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:30am.
- After that, I helped Kak Ida on something related to SMT Department as I did yesterday.
- I tracked down the lots that has low yield and went to SMT Department to gather information on the reject causes.
- After that, I went to inspects all the TV that I put up.
- The TV in MCOB A Department encountered connection issue.
- Therefore, I settled
- Then, Mr KL Tang assigned me to contact a vendor name Zhetwein.
- Zhetwein is a vendor in MCOB B Department and he needed my help to gather some data under his guidance.
- I agreed on meeting him after lunch break.
- After lunch break, I met Zhetwein in FAVI.
- I was introduced to Yen Peng, Zhetwein’s assistant.
- Yen Peng taught me on how to retrieve the data from the machines.
- I spend my whole evening retrieving the data for Zhetwein.
- The data were to compare the effectiveness of the new implementation they made for the machines.
- As for the vendor name David, he told me that he could not make it today and asked his assistant, Wan Li to contact me and arrange an appointment to meet her tomorrow.
7/10/2020 (Wednesday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:30am.
- Wan Li set up to meet me at 9:30am.
- Upon waiting for Wan Li’s arrival, I went to the store security to get the approvement from the security on duty.
- Then, I handed the magazine requested by the vendor along with an approved property pass.
- Later, Mr KL Tang came with two new internship trainees.
- Mr KL Tang asked me to give them a quick tour around SMT and MCOB Department.
- After lunch break, I was assigned with a task by Mr KL Tang.
- He asked me to find out the lot with low yield and validate the reject stated in the database.
- I went to find the lot at the MCOB A Department where I met the manager there name Yen Ha.
- Yen Ha guided me to the cabinet that contained low yield lots.
- I searched for the respective lot and brought them to MCOB B Department.
- There, I asked Kak Macitah to help me to inspect the reject using microscope.
- After validating the reject, I captured some photos of the rejected units and sent to Mr KL Tang.
- After that, I brought the two trainees to the OGP Machine.
- I taught them about the basic program that can be written using the machine.
- After that, I helped Mr Shazni out to measure the laser mark size for dummy panel and production panel.
- This was to compare the differences of the size of the laser mark.
8/10/2020 (Thursday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:30am.
- After that, I helped Kak Ida on something related to SMT Department as I did yesterday.
- I tracked down the lots that has low yield and went to SMT Department to gather information on the reject causes.
- Later, I assisted Mr KL Tang on training the internship trainees.
- I brought them to the IT Department to help them install the database.
- Then, I taught one of them on the yield updating using Microsoft Office Excel.
- I also taught them a few things on the daily job that I have to do and required them to do the same job every day.
- After lunch break, continued to train the internship trainees.
- I taught them to analyse the daily yield data for SMT and MCOB Department respectively.
- I also taught them on how to interpret data and represent data in the best form of graph using Pivot table.
9/10/2020 (Friday)
Working time: 8:30am – 6:00pm
- I started my day by updating the daily yield as per request by Mr KL Tang before 9:30am.
- After that, I helped Kak Ida on something related to SMT Department as I did yesterday.
- I tracked down the lots that has low yield and went to SMT Department to gather information on the reject causes.
- Then, I went to inspect all the TV at both SMT and MCOB Department to ensure that they display content as per request.
- Later, I continued to teach the new internship trainee to enhance their Microsoft Excel Skill.
- After lunch break, I continued with the training for the new internship.
- Before going back, I went to HR Department.
- I returned back the jumpsuit and ESD shoe.
- Mr Zafryl handed me a certificate of appreciation for completing the internship.