LOGBOOK

WEEK 6

My sixth week internship at TAS SOLUTION SDN BHD. 

(15th July 2018 - 21st July 2018)

16th of July

Monday

1. Laid three core wire for the partition booth.

2. Wire up 3 pin socket as an electrical source point for each booth. 

-In the socket, there are 3 pin to connect that is live, neutral,ground. 

-green wire is for ground and it is to be connected at top pin.

-brown wire is for live and it is to be connected at right pin where the fuse is located. 

-blue wire is for neutral and it is to be connected at left pin. 

3. I test the connection by plugging in phone charger at each of the point to see if the connection were done correctly. 

 

17th of July

Tuesday

1. Manage my supervisor booth. I entertain questions and explained to visitor about the product that my supervisor showcase. 

2. Product that I need to present was egg incubator. 

3. The incubator was Arduino based and it can be monitor using smartphone by using custom app.

4. The incubator has heating element, egg tray, water reservoir, fan, temperature and humidity sensor, and motors. 

 

18th of July

Wednesday

1. Still managing my supervisor booth. 

2. After lunch time, visitor number has decreasing. I took time exploring the exhibition to look at various products. 

3. Found a great product which was augmented reality welding trainer.

4. The augmented reality welding trainer helps amateur welder to learn welding technique more easily. 

5. The product consist of real-like welding kit making the welding session felt like authentic. 

6. The product also can evaluate on how the welder weld metal. 

19th of July

Wednesday

1. Disassemble the exhibition partition as it ends today. 

2. Re-wrap all the aluminium profile.

3. Store all of the exhibition parts in store. 

20th of July

Friday

1. Have a discussion session with supervisor and other trainee. 

2. Things that were discussed 

i.future project

-3 projects were discussed which were explosive detection robot, shelf with security system and website server.

ii.internship feedback

-All trainee were giving feedback for training that we have done.

 

 

21st of July

Saturday

1. Did a housekeeping duty.

2. My supervisor ask me to reorganize office layout.

-The reason was to make space in the office as the office were crowded with unused material. 

4. Propose a new layout. 

5. Re-organize all shelf and start clearing unnecessary stuff to clear the office.