Log Book -Week 8

Text

30 July

 

  • Edit the result of Veritas Stability cause didnt consider free surface effect.
  • Getting the results and comparing with the client's result.

31 July

 

  • The electrical drawing is given.
  • Instructed to study electrical part from the book ( Rule of Steel Ship: Part C,Chapter 2: Electrical Installation)

1 August

 

  • Reading

 

2 August

  • Being introduced to En Syukri to learn about electrical.

 

3 August

  • There are 2 type of essential service which are Primary and Secondary.
  • Primary are those which need to be maintained in continuous operation such as steering gear, propeller and some of the electrical equipment for electric propulsion plant.
  • Primary are those which not need to be maintained in continuous operation such as windlasses, thrusters and fuel oil transfer pump.

 

 

Text