Date: 16 – 20 July 2018
Work Week: 6 ( Date: 16 – 20 July 2018) |
|
16 July (Monday)
|
2.Create lines plan based on the client line plan
|
17 July (Tuesday)
|
3.Check the shape and modify the error 4.Check the hydrostatic value
The error is calculated by comparing the designer value from the stability booklet and the software (Veritastability) value. Based on the IACS, the tolerances of displacement is 2% whereas the tolerances of LCB is 1%. **Check by using excel (The design draft =2.35m+-1m is more important) Since the tolerance around the draft is within the range, the ship shape can be used. |
18 July (Wednesday) |
Manage compartment ( Click the tank used in the ship) BHD's definition ( Create longitudinal and traverse bhdhead to separate the tank/compartment) Part defination (creating part based on the bhd created) |
19 July (Thursday)
|
|
20 July (Friday) |
|