Industrial Training Week 5

Day

Date

Description

Monday

9/7/18

- Visit the test cell.

  - Preserve oil at T58-GE100 engine after the test is done and the engine is fine.

  - The internal parts of the engine are coated with oil.

  - The engine is run about 10 minutes.

  - The engine is to be brought out because it has finished testing and to another engine is replaced for its tests.

 

Tuesday

10/7/18

-  Do wire-locking at the T58-GE100 engine.

  - After the engine done testing it will be brought back to the engine shop.

  - Do the wire-locking at the nut.

  - To prevent the nut from loose.

- Rearrange T58-GE100 engine at the engine shop.

 

Wednesday

11/7/18

- Converting T58-GE100 engine from No.1 to No. 2.

  - Only need to remove the power turbine section of the engine.

  - The parts on the side of the exhaust casing are switched 180 degrees diagonally.

- Put the finished T58-GE100 engine into a container.

  - Because to preserve the engine.

  - The engine needs to be sold to the customer.

 

Thursday

12/7/18

- Install Fuel Control Unit accessory to the T58-GE100 engine.

- The Department Hari Raya Event.

 

Friday

13/7/18

-  Do wire-locking at the T58-GE100 engine.

  - After the engine done testing it will be brought back to the engine shop.

  - Do the wire-locking at the nut.

  - To prevent the nut from loose.

- Put the finished T58-GE100 engine into a container.

  - Because to preserve the engine.

  - The engine needs to be sold to the customer.