Industrial Training Week 5
|
Day |
Date |
Description |
|
Monday |
9/7/18 |
- Visit the test cell. - Preserve oil at T58-GE100 engine after the test is done and the engine is fine. - The internal parts of the engine are coated with oil. - The engine is run about 10 minutes. - The engine is to be brought out because it has finished testing and to another engine is replaced for its tests.
|
|
Tuesday |
10/7/18 |
- Do wire-locking at the T58-GE100 engine. - After the engine done testing it will be brought back to the engine shop. - Do the wire-locking at the nut. - To prevent the nut from loose. - Rearrange T58-GE100 engine at the engine shop.
|
|
Wednesday |
11/7/18 |
- Converting T58-GE100 engine from No.1 to No. 2. - Only need to remove the power turbine section of the engine. - The parts on the side of the exhaust casing are switched 180 degrees diagonally. - Put the finished T58-GE100 engine into a container. - Because to preserve the engine. - The engine needs to be sold to the customer.
|
|
Thursday |
12/7/18 |
- Install Fuel Control Unit accessory to the T58-GE100 engine. - The Department Hari Raya Event.
|
|
Friday |
13/7/18 |
- Do wire-locking at the T58-GE100 engine. - After the engine done testing it will be brought back to the engine shop. - Do the wire-locking at the nut. - To prevent the nut from loose. - Put the finished T58-GE100 engine into a container. - Because to preserve the engine. - The engine needs to be sold to the customer.
|