Industrial Training (3rd Week)

25th June 2018 - 30th June 2018

 

Date : 25th June 2018

Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya

 

 Activities

1. Received method statement from QAQC Engineer.

2. M&E Manager assigned me to study and understand the method statement regarding to Testing and Commissioning of mechanical system.

 

Date : 26th June 2018

Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya

 

 Activities

1. Study and understanding the Testing and Commissioning procedure for air conditioning and mechanical ventilation system.

2. Had a Quality Induction briefing from the QAQC Manager.

3. Had be assigned to monitor the passenger lift car of the building. This is due to some mistakes made by sub cont and the installation of the passenger lift car is not following the technical specifications.

4. Attend M&E technical meeting with client.

 

Date : 27th June 2018

Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya

 

 Activities

1. Had site visit with the supervisor.

2. Study and understanding the Testing and Commissioning procedure for fire fighting system.

3. Attend floor marshal meeting. Had been assigned to be floor marshal for housekeeping purposes.

 

Date : 28th June 2018

Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya

 

 Activities

1. Supervisor assigned me to check the final fittings of hose reel at Basement 2 and Basement 1.

2. Supervisor briefly explained the things that need to be done.

3. Attend weekly progress meeting of Mechanical and Electrical department,

 

Date : 29th June 2018

Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya

 

 Activities

1. Checking the final fittings of the hose reel.

2. Attend Health Safety and Environment committee meeting.

3. Monitor level 5 condition as a floor marshall.

 

Date : 30th June 2018

Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya

 

 Activities

1. Supervisor assigned me to check the final fittings of sprinkler heads inside the buildings,

2. Checked the final fittings of sprinkler head at Basement 2 and 1.