Industrial Training (2nd Week)
18th June 2018 - 23rd June 2018
Date : 18th June 2018
Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya
Activities
1. Supervisor assigned me to study the schematic drawing of the systems in the building.
Date : 19th June 2018
Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya
Activities
1. Continue studying schematic drawing of various systems of the building.
2. Mechanical and Electrical Department handle fire fighting system, air conditioning and ventilation system, elevation system, lightning protection system and plumbing system.
Date : 20th June 2018
Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya
Activities
1. Toolbox session in the morning,
2. Doing some research on air conditioning and ventilation system of a building.
3. For this company's project, the building using Variable Refrigerant Volume (VRV) system.
Date : 21st June 2018
Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya
Activities
1. In the morning, going for site visit with the supervisor.
2. Supervisor show the flow of fire fighting system in the building.
Picture above shows the pumps for fire fighting system
Picture above showing the workers installing the "EXIT" sign.
Date : 22nd June 2018
Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya
Activities
1. Continue visiting project site in the morning.
2. Ms. Nabila, a QAQC Engineer of this project showing the defects during the constructions works and things need to be corrected.
3.On the afternoon, follow the Mechanical and Electrical Department for site walk with the sub contractors involved in this project.
4. Things that I learnt from this site walk is, sub contractors need to finish their job according to the time given to avoid project delay. Main contractor also need to supervise the progress of the sub contractors works in order to produce a great quality of work.
Date : 23rd June 2018
Location : Pejabat Tapak Parcel Z, Jalan Alamanda Precint 1, 62000 Wilayah Persekutuan, Putrajaya
Activities
1. Study on the processes involved in construction project.
2. Identify the roles of architect and engineers in constructions project.