Friday, 3rd August 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering Central Store (ECS)/Ground service equipment building

 

0830: Arriving site office

1000: Replacing new pendaflour lamp, ballast and starter to replace with the old lamp at the office

1100: Drilling concrete floor at the vehicle maintenance workshop to provide yellow pole at workshop entrance proper base/footing.

1430: Installing bent steel reinforcement to hold the entrance pole

1600: Worked area housekeeping

 

1730: Going back home

Industrial training-log book

Thursday, 2nd August 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Ground service equipment building

 

0830: Arriving site office

1000: Servicing AHU at GSE building; Rinsing air-cond coil with water jet, and spraying chemical air-cond coil cleaner by pressure sprayer

1100: Waiting for the dirt inside the coil to coagulate/accumulate and rinse it with water

1200: Removing the AHU filters from inside AHU to remove the old filter cotton and replace it with a new one.

1430: Closing and securing AHU door

1500: AHU room housekeeping

1600: Installing new pipe at the sink

1700: Cutting excess bolt on the floor to avoid the worker from tripping

1730: Going back home

Industrial training-log book

Wednesday, 1st August 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Ground service equipment building

 

0830: Arriving site office

1000: Installing new pendaflour lamp to replace broke old pendaflour lamp at the turbine engine storage room

1100: Installing thin aluminium plate on the old door unit

1730: Going back

Industrial training-log book

Tuesday, 31st July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Hangar 06

 

0830: Arriving site office

1000: Installing new pendaflour lamp to replace broke old pendaflour lamp

1100: Troubleshooting the electrical control panel nearby

1430: Servicing air-conditioner split unit (ACSU) at the hangar 05 office

1730: Going back

Industrial training-log book

Monday, 30th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Ground Service Equipment building

 

0830: Arriving site office

1000: Checking roller-shutter motor and power supply

1100: Installing new lamp to replace the broke pendaflour lamp.

1430: Checking/troubleshooting clogged drainage system at emergency eye-wash shower point.

1730: Going back

Industrial training-log book

Friday, 27th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building

 

0830: Arriving site office

1000: Checking power supply for the drilling machine at the workshop.

1100: Installing warning sign at the temporary break-down machine.

1430: Inspecting riser and FM200 system.

1730: Going back

Industrial training-log book

Thursday, 26th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, MAB Masjid.

 

0830: Arriving site office

1000:Mixing a concrete for laying process of the drilled wall.

1100: Laying a cement at the drilled wall.

1430: Open the water source to ensure there's no leaking and it is working in normal behavior.

1730: Going back

Industrial training-log book

Wednesday, 25th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, MAB Masjid.

 

0830: Arriving site office

1000: Drill wall to replace embedded broke valve with a new valve

1100: Rubbing the PVC glue at the PVC pipe fittings

1430: Install new valve

1730: Going back

Industrial training-log book

Tuesday, 24th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Disassembling the fittings of 100hp motor and removing the motor from track.

1430: Placing 100hp motor inside a truck for maintainance of the motor.

1730: Going back

Industrial training-log book

Monday, 23rd July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Assisting MAB technician troubleshooting AHU control system.

1430: Found the 100hp motor are not operating

1730: Going back

Industrial training-log book

Friday, 20th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Plugging relay into the control panel

1430: Calling charge-man to troubleshoot the control panel

1630: Checking electrical source and each relay inside control panel at AHU  control room Hangar 06.

1730: Going back

Industrial training-log book

Thursday,19th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Checking AHU control panel at Hangar 06

1430: Found the relay component inside control panel producing buzzing sound

1630: Finding the 24 vdc relay at site office store, administration building store, and engineering building store.

1730: Buy relay from electrical shop near Salak Tinggi.

1900:Going back

Industrial training-log book

Wednesday,18th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Received WO from the MAB Engineering team.

1430: Inspecting air handling unit control room

1630: Troubleshooting the AHU control unit

1730: Going back

Industrial training-log book

Tuesday,17th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) removing the mobile fire extinguisher, 140kg  (ABC powder and CO2) from the fire extinguisher point to temporary storage room.

1430: Sorting and separating the mobile fire extinguisher between disposal and renewing bomba endorsement certificate.

1730: Going back

Industrial training-log book

Monday, 16th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Checking and replacing new pipe at the hangar 06 cafe.

1430: Testing the water supply for the pipe sink.

1630: Replacing new electrical fly  trap for the food vendor at hangar 06 cafe.

1730: Going back

Industrial training-log book

Friday, 13th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Filling/laying plaster at the crack-propagated wall for temporary step.

1430: Checking the clogged piping system inside the aircraft workshop

1730: Going back

Industrial training-log book

Thursday, 12th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Administration building.

 

0830: Arriving site office

1000: Received a new WO(work order) and attend at the facilities to be maintained.

1430: Checking and troubleshooting valve for the Air handling unit air-conditioning system.

1730: Going back

Industrial training-log book

Wednesday, 11th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Assisting technician replacing the filament lamp with a new one at the machine shop.

1430: Installing a new door handle at the fire-rated door at the machine shop.

1730: Going back

Industrial training-log book

Tuesday, 10th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Administration building and Masjid MAB.

 

0830: Arriving site office

1000: Assisting chargeman replacing the fuse inside the panel box

1430: Troubleshooting the electrical power source non-existent by replacing fuse and checking the control panel box.

1730: Going back

Industrial training-log book

Monday, 9th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Administration building.

 

0830: Arriving site office

1000: Assisting chargeman servicing the generator-set at the administration building.

1430: checking the control panel for generator-set and ensure that it is in a good condition.

1730: Going back

Industrial training-log book

Friday, 6th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Administration building.

 

0830: Arriving site office

1000: Assisting technician servicing the air-conditioner split unit for the administration office.

1430: Troubleshooting the air-conditioner system's temperature by filling the R22 gas.

1730: Going back

Industrial training-log book

Thursday, 5th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Administration building. 

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) placing fire extinguisher at the auditorium, and safety office, at level two.

1430: Inspecting fire extinguisher hook at auditorium and safety office at level two.

1730: Going back

Industrial training-log book

Wednesday, 4th July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Administration building. 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) placing fire extinguisher at the cafe in level one.

1430: Inspecting fire extinguisher hook at the cafe in level one.

1730: Going back

Industrial training-log book

Tuesday, 3rd July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering Central Store, ECS.

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) placing fire extinguisher at one of AHU (Air Handling Unit) room for temporary storage.

1130:Assisting SHO (Safety and Health Officer) installing/preparing fire extinguisher at FCR(Fire Control Room)

1430: Inspecting fire extinguisher hook at FCR(Fire Control Room).

1730: Going back

Industrial training-log book

Monday, 2nd July 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering Central Store, ECS.

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) installing/preparing fire protection system at flammable material storage room.

1430: Inspecting fire extinguisher hook at flammable material storage room.

1730: Going back

Industrial training-log book

Friday, 29th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Ground service equipment, GSE.

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) installing/preparing fire protection system at overhaul shop and diesel point. 

1430: Inspecting fire extinguisher hook at overhaul shop and diesel point.

1730: Going back

Industrial training-log book

Thursday, 28th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Ground service equipment, GSE.

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) installing/preparing fire protection system at Painting shop and fabricating shop.

1430: Inspecting fire extinguisher hook at painting shop and fabricating shop.

1730: Going back

Industrial training-log book

Wednesday, 27th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) installing/preparing fire protection system at Hangar 05 and Hangar 06. (continuing previous task)

1430: Inspecting fire extinguisher hook at hangar 05 & hangar 06

1730: Going back

Industrial training-log book

Tuesday, 26th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB, Engineering building.

 

0830: Arriving site office

1000: Assisting SHO (Safety and Health Officer) installing/preparing fire protection system at Hangar 05 and Hangar 06.

1430: Checking the Bomba standard specification for fire extinguisher (Label, condition, fire extinguisher hook, etc.)

1530: Removing fire extinguisher that are exceeding the expiry date 

 and replace with a new one.

1730: Going back

Industrial training-log book

Monday, 25th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Arriving site office

1000: Morning briefing for the WO (work-order) maintaining the assets/facilities of client at the site

1430: Assisting technician at the site traoubleshooting the air-conditioning system

1530: Checking for the source of error for the air-conditioning system to be malfunctioning

1730: Going back

Industrial training-log book

Friday, 22nd June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Arriving site office

1000: Assisting administration staff with list of inventory at site office

1430: Checking the condition of inventory and the inventory's component checklist.

1730: Going back

Industrial training-log book

Thursday, 21st June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Arriving site office

1000: Documenting water sprinkler fire protection system

1430: Consulting supervisor for bomba endorsement form submission

1730: Going back.

follow zahir on instagram @_zahirahmad

Industrial training-log book

Wednesday, 20th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Studying dry/wet riser fire protection system

1000: Studying water sprinkler fire protection system

1430: Facilities maintenance site inspection at MAB administration building

1730: Going back.

Industrial training-log book

Tuesday, 19th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Facilities maintenance site inspection at MAB administration building

1000: Assisting electrical engineer on checking electrical power consumption and monthly site electrical bill

1430: Doing projection for annual's trend on electrical power consumption and monthly site electrical bill

1730: Going back.

Industrial training-log book

Monday, 18th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

Hari raya Aidilfitri leave

Industrial training-log book

Friday, 15th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 Public Holiday

Industrial training-log book

Thursday, 14th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Arriving MAB's engineering complex

1000: Meeting with Senior Facility manager

1230: Studying fire protection system

1300: Going back.

 

Industrial training-log book

Wednesday, 13th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Arriving MAB's engineering complex

1000: Daily pass security briefing by MAHB's security staff

1230: Studying Argonite fire protection system

1430: Studying wet riser fire protection system

1530: Studying sprinkler fire protection system and its layout plan in MAB's hangar

1630: Going back.

Industrial training-log book

Tuesday, 12th June 2018, KFM solutions Sdn. Bhd.- Kompleks kejuruteraan MAB

 

0830: Staff meeting at KFM Solutions Sdn. Bhd.

1000: Facilities maintenance site inspection at MAB administration building

1230: Classifying KFM Solutions Sdn. Bhd. fire protection services folder/documents for Bomba's endorsement application.

1430: Documenting fire protection services due to Bomba's criteria.

1530: Background studies for fire protection services at such venues: Hangar, Administration building and cargo.

1630: Going back.

Industrial training-log book

Monday, 11th June 2018, KFM solutions Sdb. Bhd.- Kompleks kejuruteraan MAB

 

0830: Self-report at KFM Solutions Sdn. Bhd.

0900: Short company background briefing delivered by administration staff and Civil and structure engineer.

1000: Scope of work explanation by supervisor

1230: Background study of basic introduction to chilling and air-conditioning system.

 

1430: Background study of electric motor and electric motor starter

 

1530: Background study of air-conditioning system in variety size of air-conditioned space.

1630: Going back.