WEEK 1

 

DAY  DATE  ACTIVITY
MONDAY 11/6/2018
  • General overview briefing about the company and safety briefing.
  • Making some research on how to develop facebook page for the company. 4 company to be compared which is our competitor in finding contract workers, technip fmc, mcdermott, desb and dialog.
TUESDAY 12/6/2018
  • Meeting and presentation at corporate communication department to suggest the idea of developing company Facebook and make it active. This way was taken to recruit offshore labor by post job vacancy through Facebook. 
WEDNESDAY 13/6/2018 
  • Create an example of posting for our page to hire new offshore crew. We agreed to use "ayat pasar" to attract people out there joining us since we know most of them not have high education. So this the way to get high number of applicant.
THURSDAY 14/6/2018  
  • Submit the first draft of posting to corporate communication for their checking. there is important to make sure the picture is are valid. Valid here means this picture is ours and if there is a person in the picture, confirm each person either he/she still working with our company. Need superimpose Sapura Energy Logo in PPE.  

WhatsApp Image 2018-06-13 at 1_26_30 PM.jpeg

FRIDAY 15/6/2018 
  •  HARI RAYA AIDILFITRI

WEEK 2

 

DAY  DATE  ACTIVITY
MONDAY 19/6/2018
  • HARI RAYA AIDILFITRI
TUESDAY 20/6/2018
  • Submit 2nd draft of posting with editted picture. 
WEDNESDAY 21/6/2018 
  • Learning flow of project that consist Engineering, Procurement, Construction, Commissioning and Management (EPCCM). For my department, our job scope consist of Procurement and Management that base in KL. For the construction and commissioning will be based at Kemaman. Engineering will be done by other company. Study the job scope for each position. Example as a field engineer you responsible to plan and prioritize work.
THURSDAY 22/6/2018
  • Update latest draft to Corporate Communication for their feedback and comment. Study on company guidlene for placing the logo in each picture. 
  • Go through each resume sent by applicant and check their qualification either meet the requirement or not based on position applied.
  • Do summary review for offshore crew application. 

FRIDAY 23/6/2018 
  • Replace the image based on comment from corporate communication team. The full guideline will be give by next week.
  • Continue assisting worklead engineer do summary for crew resume.  

WEEK 3

 

DAY  DATE  ACTIVITY
MONDAY 25/6/2018
  • Check the Sapura Energy Berhad Facebook page. Study the guideline as an admin of the page. First draft was upload on the page to be checked by other admin. 

  •  

    Every image to be posted must be checked using FB image checker to get good rating 

    fb.PNG

TUESDAY 26/6/2018

 

gf.PNG

WEDNESDAY 27/6/2018 
  • Attend the weekly progress meeting conference. Discussing about the progress project hook up and commisioning in Terengganu which mostly was maintenance work on platform.
  • This cover all area from HSE, Fabrication, Manpower Schedule, Painting, and Billing.
  • Solve some new issues about the crew mobilization. 
  • Learning how the crew change schedule. 

crew change.PNG

THURSDAY 28/6/2018
  • Prepare more picture to be post on the Facebook page. SERTAI KAMI.png.1
FRIDAY 29/6/2018 
  • Replace the image based on comment from corporate communication team. The full guideline will be give by next week.
  • Continue assisting worklead engineer do summary for crew resume.  

WEEK 4

 

DAY  DATE  ACTIVITY
MONDAY 2/7/2018
  • Review new resume application for different position for offshore crew. Doing summary for the all the resume that meet the requirement. Fill the personal charge rate then send to ExxonMobil to be approved. 

    Capturesummary2-7.PNG

TUESDAY 3/7/2018
  • Internal meeting discuss about manpower mobility, fabrication progress and painting progress. Any delay item must be remark for client update. Any action on every item must be stated. Present the latest result from Facebook page as a platform to hire new offshore crew. below are the result.CaptureFB4-7.PNG
WEDNESDAY 4/7/2018 
  • Study weekly updated schedule and prepare for the weekly meeting on next Tuesday. Capture.PNG

 

THURSDAY 5/7/2018
  • Review the Resume that we get from FB ads and determine the qualification for every applicant based on position apply. 

Capture.PNG.2

FRIDAY 6/7/2018 
  • Continue doing CV summary
  • Proceed the completed application for Personnel Charge Rate (PCR) to the Client (ExxonMobil). 

WEEK 5

 

DAY  DATE  ACTIVITY
MONDAY 9/7/2018
  • Calculated total number of monthly manpower mobility.
  • Reply any comment or enquiry on FB Page.
  • Assist the workpack engineer preparing updated Weekly Minute of Meeting.

9.7.PNG

 

TUESDAY 10/7/2018
  • Weekly progress meeting.
  • Assist work pack engineer updated on Manpower number based on this week and latest mobility on server.

10.7.PNG

 

WEDNESDAY 11/7/2018 
  •  Assist the engineer to calculate cancellation frequency for each crew.

12.7.PNG

THURSDAY 12/7/2018
  • Assist the manager to divide the token to every staff in Terengganu office and KL office.
  • Assist the engineer to review resume of applicant for the offshore crew.  
FRIDAY 13/7/2018 
  • Short brief on calculation for fabrication progress.
  • Calculate the surface area of the spool refer to the IFC drwaing.  13.7.PNG

WEEK 6

 

DAY  DATE  ACTIVITY
MONDAY 16/7/2018
  • Internal Hari Raya Celebration at Megan Avenue II Office
  • Prepared updated weekly minute of meeting.

16.7.PNG

TUESDAY 17/7/2018
  • Weekly progress meeting. 
  • Covers on AN, HSE, MANPOWER, FABRICATION, BILLING AND PAINTING.

17.7.PNG

WEDNESDAY 18/7/2018 
  • Volunteer on Sapura Energy Annual Grand Meeting 2018.
  • Meet the shareholder and share new info with them. 

AGM.jpeg

THURSDAY 19/7/2018
  • Medical Leave 
FRIDAY 20/7/2018 
  • Medical Leave

WEEK 7

 

DAY  DATE  ACTIVITY
MONDAY 23/7/2018
  •  Prepared and uploaded new post on FB page. 23.7.PNG
TUESDAY 24/7/2018
  • Link created will directly go to our Whatsapp account for applicant can easily ask about vacancy.
  • Due to high number of applicant click the link. I changed the Whatsapp account from personal account to business account.
  • Whatsapp business can create auto reply if detect some keyword in the conversation.

 24.7.PNG

WEDNESDAY 25/7/2018 
  • Devided the CV received among recruitment team to be reviewed. 
  • Most crucial position will be on top prioritize and reviewed first.
THURSDAY 26/7/2018
  • Control FB page on the post.
  • Replied all related DM and comment.
  • Hide any comment that using bad words or give a bad image for the company.
  • Check the performance of this post.  26.7.PNG
FRIDAY 27/7/2018 
  •  Tabulated the CV reviewed data for higher management reference.

27.7.PNG

WEEK 8

 

DAY  DATE  ACTIVITY
MONDAY 30/7/2018
  • Updated the number of email and WhatsApp received.
  • Divided the new CV among colleague to be review.
TUESDAY 31/7/2018
  •  Annual Leave (MASUM 2018)
WEDNESDAY 1/8/2018 
  • Annual Leave (MASUM 2018) 
THURSDAY 2/8/2018
  • Annual Leave (MASUM 2018) 
FRIDAY 3/8/2018 
  •  Updated the number of CV has been reviewed. 

3.8.PNG

WEEK 9

 

DAY  DATE  ACTIVITY
MONDAY 6/8/2018
  •  Prepared and posted new post on FB

6.8.PNG

TUESDAY 7/8/2018
  • Checked the performance of the post.
  • Review all new received resume.

7.8.PNG

WEDNESDAY 8/8/2018 
  • Send the accepted resume summary to submit Exxon for PCR approved.
  • 8.8.PNG
  • Rechecked the email on sapurapinewell@gmail.com to find the shortage of email received based on summary. 
  • e8.8.PNG
THURSDAY 9/8/2018
  • Clarify the accepted resume status that have been submitted to Exxon refer to manning list by Exxon. 
  • 9.8.PNG
FRIDAY 10/8/2018 
  • Kick-off meeting on HTS project roadshow and walk interview. 
  • Planning the schedule and task.
  • Distributed the task among the team to prepared their budget for this project.

WEEK 10

DAY DATE  ACTIVITY
MONDAY 13/8/2018
  • Prepared new post for advertisement of the roadshow and walk-in interview event.
  • Attached in marketing division which need to design banner, bunting and poster.13.8.PNG.2
TUESDAY 14/8/2018
  • Spread the event news through people on our WhatsApp database. 
  • Last draft for bunting and banner to be approved by Senior Project Manager. 
  • A3.png.2
WEDNESDAY 15/8/2018
  • Last draft for the event post.
  • Edit old post on FB Page to advertise our walk-in interview event.
  • We edit the old post with highest number of people reach to use as advertisement. 
  • fb ad123.PNG
  • From the paid advertisement, we reached 47000 people.
THURSDAY 16/8/2018
  • Prepared all the item need to bring for the event.
  • Do checklist for every item from office.
  • Reply every question about the event on FB Page and Whatsapp.
FRIDAY 17/8/2018
  • CHECK ALL THE ITEM NEED TO BRING FOR THE EVENT IN KUALA TERENGGANU
  • TRAVEL TO K.TERENGGANU
  • WhatsApp Image 2018-08-17 at 12.58.56 PM.jpeg
  • SETUP THE VENUE FOR THE EVENT
SATURDAY 18/8/2018
  • First day event.
  • Combine all the position apply in a master list.
  • Calculate the number of applicant which comply all the requirement.
  • WhatsApp Image 2018-08-19 at 1.16.18 AM.jpeg
SUNDAY 19/8/2018  
  • Second day event.
  • Combine all the position apply in a master list.
  • Calculate the total number of applicant both day which comply all the requirement.
  • WhatsApp Image 2018-08-20 at 2.14.28 AM.jpeg

WEEK 11

DAY DATE  ACTIVITY
MONDAY 20/8/2018
  • Deliver the item from the event venue to store at site office in K.Terengganu.
  • Check the list item with the delivery instruction.
  • WhatsApp Image 2018-08-19 at 9.54.40 PM.jpeg.1
  • Travel to Kuala Lumpur from Kuala Terengganu. 
TUESDAY 21/8/2018
  • Prepared register form for Kota Bharu event.
  • Update the applicant summary for Kuala Terengganu.
  • Communicate with corporate communication to ask for extra mobile display for the next event venue.
  • Update the application form for Kota Bharu with additional requirement.   
WEDNESDAY 22/8/2018
  • Eidul Adha Celebration
THURSDAY 23/8/2018
  • Prepared remaining to be bring to Kota Bharu
FRIDAY 24/8/2018
  • Pickup item from Human Resources at Sapura@Mines
  • Travel to Kota Bharu, Kelantan from Subang Airport
SATURDAY 25/8/2018
  • First day event.
  • Combine all the position apply in a master list.
  • Calculate the number of applicant which comply all the requirement.

SUNDAY 26/8/2018  
  • Second day event.
  • Combine all the position apply in a master list.
  • Calculate the number of applicant which comply all the requirement.
  • Packing up all the item to deliver to Kemaman, Terengganu.

WEEK 12

DAY DATE  ACTIVITY
MONDAY 27/8/2018
  • Travel from Kota Bharu, Kelantan to Kemaman, Terengganu.
  • Setup the walk-in interview location at Teluk Kalong Yard, Kemaman.
TUESDAY 28/8/2018  
  • First day event.
  • Combine all the position apply in a master list.
  • Calculate the number of applicant which comply all the requirement.
  • Update on FB page for the venue in Shah Alam, Selangor.
WEDNESDAY 29/8/2018  
  • Second day event.
  • Combine all the position apply in a master list.
  • Calculate the number of applicant which comply all the requirement.
  • Packing all the item and deliver to Shah Alam, Selangor by land transport.
THURSDAY 30/8/2018
  • Travel to Kuala Lumpur from Kerteh Airport,Terengganu.
FRIDAY 31/8/2018
  • Setup walk-in interview venue at Shah Alam Convention Centre (SACC).
SATURDAY 1/9/2018  
  • First day event.
  • Combine all the position apply in a master list.
  • Calculate the number of applicant which comply all the requirement.
SUNDAY 2/9/2018  
  • First day event.
  • Combine all the position apply in a master list.
  • Calculate the number of applicant which comply all the requirement.
  • Packing all the item to be stored at Megan Even office.
  • Do checklist of every item to be stored.