SBEG1443 - GIS for TNB

                                                                                         ir fazilah 1.jpg

Biography

Ir Hjh Fazilah Mat Yatim has been working as Electrical Engineer with Tenaga Nasional Berhad (TNB) for the past 28 years. She has a degree in Electrical and Electronic Engineering from Plymouth University, UK, Master of Engineering in Electrical Energy and Power Systems from University of Malaya, Malaysia and currently she has just completed her PhD viva on GIS (Management) from UTM, Skudai, Johor Bahru. She has experienced at Distribution level in Operation & Maintenance, Customer Service, Planning, Construction, District Management, Business Management, Procument, Meter, Mobile Field Force Project, Fleet & Land Matters. Currently, she is the Head of Project (GIS) of Distribution Network. She is also a Professional Engineer and Competent Engineer.

                                                                    IMG_20190922_111449.jpeg

Discussion

I want to discuss about the presentation delivered by Ir Hjh Fazilah Mat Yatim. I chose to write about this topic because the content of the presentation struck a certain chord with my feelings and attitudes towards GIS and its contribution and achievement in TNB Distribution.  

GIS in TNB Distribution

  • Shape Regulatory Outcome – To support GSL 1 (frequency of interruption) & GSL 2 (restoration time)
  • Exceed Customer Expectation – Providing accurate customer location data
  • Drive Operational Cost Efficiency – Strategize planning of new supply, operation & maintenance
  • Transform Organization – Managing assets geographically

An Overview of GIS Distribution Network

GIS Usage: - a tool for data captured, stored, edit, analyzed, integrate, manage, query and display in geographic forms

Infrastructure: - Enterprise Wide System

                           - GIS software is GE Smallworld 4.1.2

                           - WGS 84 for GPS coordinate system

                           - UTM 47N for projection

Applications: GIS Functions

  • Asset Register
  • Supply New Connection
  • Reconnection
  • Project Planning & Wayleave Planning
  • Construction Projects
  • Customer Service Support

Applications: GIS Solutions

DESKTOP – Use to digitize lot of TNB network assets and perform specific electric network analysis or tracing

MOBILE – A tool to allow doing site visit verification and maintenance work on site

LITE EDITOR – Use web browser for simple search, simple redline and sketching

SMARTVIEW – Use to visualize and locate TNB assets on Google Map with street view and directions

MYSIGHT – Use to add and locate selected TNB assets on Google Map on mobile phone

Why TNB embark on GIS?

  • Technology disruptions: IR 4.0

Dramatically changing the power sector and customer demands

  • Regulations evolving: MESI 2.0 reforms

Increasing competition due to market liberalization

  • Shareholder expectations

Shareholders demanding greater returns and transparency

  • Economic shifts

Power is shifting towards Asian and emerging market economies

GIS current achievement in TNB Distribution

  • To complete Asset Register for Medium Voltage data by year 2019
  • To complete Asset Register for Low Voltage data by year 2022