WEEK 1

DATE : 10/6/2018

DAY : SUNDAY

TIME : 8.00AM-4.00PM

ACTIVITIES

enlightenedArrived at Petronas Chemical Derivatives SDN BHD

enlightenedSafety Video Presentation

enlightenedReporting at Human Resource Department with Puan Sarizam                                    

DATE : 11/6/2018

DAY : MONDAY

TIME : 8.00AM-4.00PM

ACTIVITIES

enlightenedshort briefing by Puan Sarizam about all documents that need to be submitted

enlightenedChecking all the documents from UTM by Puan Sarizam

enlightenedReciving all PPE from Puan Sarizam

enlightenedReporting to Technical Services Department

 

DATE : 12/6/2018

DAY : TUESDAY

TIME : 8.00AM-4.00PM

ACTIVITIES

enlightenedAttend Safety Induction

enlightenedPn Rohimah bt Muda introduce me to all manager and stafs at Technical Services Department

enlightenedPn Rohimah introduce me to my supervisor which is En Mohamad Fahmi Md Bakery

 

 

 

 

 

                                                                 

 

WEEK 4

DATE : 1/7/2018

DAY : SUNDAY

TIME : 8.00AM-5.00PM 

ACTIVITIES :

enlightenedRecived notes about Risk Based Inspection (RPI)  Method from my supervisor.

enlightenedStudy and understanding about the RPI.

enlightenedFollow En Farid to butanol plant. En Farid introduce to me the corrosion cuppon that use in the plant to measure the rate of corrosion.

enlightenedStudy and understand about damage machanism.

 

DATE : 2/7/2018

DAY : MONDAY

TIME : 8.00AM-5.00PM 

ACTIVITIES 

enlightenedFollow engineers for inspection in plant. Observed that most of the victolic clamp used in the plant under corrosion.

enlightenedLearn new things in the plant expecially about type of corrosion undergoes in the plant. Learn about the use of steam trap in the plant.

enlightenedContinued study about Risk Based Inspection (RBI)

 

DATE : 3/7/2018

DAY : TUESDAY

TIME : 8.00AM-5.00PM 

ACTIVITIES :

enlightenedAssingment, update the turnaround worklist.

enlightenedFollow the technicians to the derivatives plant.

enlightenedFollow En farid to the workshop to cut the valve GA 1111C that undergoes pitting.

 

DATE : 4/7/2018

DAY : WEDNESDAY

TIME : 8.00AM-5.00PM

 

 

ACTIVITIVES :

 

enlightenedJoining presentation from MRA INTERNATIONAL SDN BHD.

enlightenedFollow En Farid to do dye-panetration test on valve GA 1111C that undergoes pitting.

enlightenedEn farid give me task to do failure analisis on the vavlve. After discaussing with my supervisor and En Azhar (bos), we decide to run all the analisis at UTM lab that will be conducted by me.

 

DATE : 5/7/2018

DAY : THURSDAY

TIME : 8.00AM-4.00PM 

ACTIVITIES :

enlightenedContinue updated the Turnaround worklist.

enlightenedDiscauss with my supervisor about all analisis that need to be run at UTM lab. I also contact Dr wan fahmin to discauss about my task.

WEEK 7

DATE : 22/7/2018

DAY : SUNDAY 

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedSite visit to Utility plant to perform thermo scanning on incinerator by using thermography scan camera.

     -Thermography scan camera is the equipment use to calculate temperature of objects/equipments by using thermal imaging system.

     -Thermal cameras detect temperature by recognizing and capturing different levels of infrared light. This light is invisible to the naked eye, but can be felt as heat if the intensity is high enough.

                                                     Image result for thermal scanning

DATE : 23/7/2018

DAY : MONDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedContinue reading materials about Risk Based Inspection (RBI)

     -Try to understand the PRBI work flow. There were some steps involved which :

               - Data gathering and analysis.

                -Corrosion study

              - Risk analysis overview

             -  PRBI inspection planning

enlightenedPrepared slide show for supervisor visit from UTM.

DATE :  24/7/2018

DAY : TUESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedDiscuss about the slide show that will be presented to my lecture with En Amir.

  - some addition and correction had been suggested by En.Amir.

enlightenedReading notes about failure machanism.

enlightenedRe-failing all inspection report in the TSD library.

DATE : 25/7/2018

DAY : WEDNESDAY

TIME : 8.00AM-5.0PM

ACTIVITIES :

enlightenedHaving some discaussion with En Amir regarding my failure analysis report. There were some information need to be added to the report.

enlightenedEn Amir also give me some example of failure analysis report that can be used for references.

enlightenedDr. Zainab, my supervisor from UTM arrived here for visit.

enlightenedAfter Dr.Zainab watched the safety video, I present to her and also En Amir about my job scope here and also my failure analysis project.

DATE : 26/7/2018

DAY : THURSDAY

TIME : 8.00AM-4.00PM

ACTIVITIES :

enlightenedOffice housekeeping

enlightenedRefilling all the inspection report in the library.

 

WEEK 10

DATE: 12/8/2018

DAY: SUNDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedAssigned by Pn Farida Aryani to rearrange and refiling PUV Reports Dosh Equipment for Butanol and EOG plant.

enlightenedContinue reading notes about type of corrosion occur in industry.

 

DATE: 13/8/2018

DAY: MONDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedAttend meeting for Turnaround 2019 (tank) with operation team.

enlightenedAttend meeting with asset management team for review failure analysis report valve GA1111C.

 

DATE: 14/8/2018

DAY: TUESDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedFrom yesterday meeting with asset management team, there were some correction and some new information that need to be add for the failure analysis project on valve GA111C.

  enlightened  Make some correction on failure analysis report.

 

DATE: 15/8/2018

DAY: WEDNESDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

Attend corrosion study review discussion for Derivatives plan.

 

DATE: 16/8/2018

DAY: THURSDAY

TIME: 8.00AM-4.00PM

ACTIVITIES:

enlightenedSite visit with En Aiman and technician for victaulic clamp project.

enlightenedStudy about Damage Mechanism.

WEEK 2

DATE : 19/6/2018

DAY : TUESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedsimple explanantion from En.Wan Zulfadli about fundamental of heat exchanger in the plant

enlightenedrecive a task from En Wan Zulfadli. Update the inspection matrix for ENT PCOGD turnaround 2017.

enlightenedI update the number of tubes and the dimension by using the drawings.

 

DATE : 20/6/2018

DAY : WEDNESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES

enlightenedContinue the previous work. Learn how to read the drawing and abstract the data needed which is the number of tube and the detail dimension.                                              

 

DATE : 21/6/2018

DAY : THURSDAY

TIME : 8.00AM-4.00PM

ACTIVITIES :

enlightenedEn Wan Zulfadhli  teached me on how to read tube drawing.

enlightenedPrint all the tube drawing for inspection.

 

 

 

 

                                                    

WEEK 5

WhatsApp Image 2018-07-12 at 12.24.01 PM.jpeg

DATE : 8/7/2018

DAY : SUNDAY

TIME : 8.00AM-5.00PM

TRAVEL : UTM ( FAILURE ANALISIS)

ACTIVITIES :

enlightenedArrived at UTM Material Lab. Discauss with Dr wan Fahmin and En. ayub about all test that i will run there. Dr wan Fahmin guide me on how to cut the valve for sample preparation.

enlightenedStart cutting the valve to prepare the sample. Since, the valve is from stainless steel, its took some time to cut.

DATE : 8/7/2018

DAY : MONDAY

TIME : 8.00AM-5.00PM

COMPANY : PETRONAS CHEMICAL DERIVATIVESB SDN BHD

DEPARTMENT : TECHNICAL SERVICES DEPARTMENT (TSD)

TRAVEL : UTM ( FAILURE ANALISIS)

ACTIVITIES :

enlightenedPrepare the sample .

enlightenedGrainding , polish , and aging process.

 

DATE : 10/7/2018

DAY : TUESDAY

TIME : 8.00AM-5.00PM

COMPANY : PETRONAS CHEMICAL DERIVATIVES SDN BHD

TRAVEL : UTM ( FAILURE ANALISIS)

ACTIVITIES :

enlightenedGet all the microstructure for all sample by using optical microstructure.

enlightenedGet 3D image of pitting area by using SEM.

 

DATE : 11/7/2018

DAY : WEDNESDAY

TIME : 8.00AM-5.00PM

TRAVEL : UTM ( FAILURE ANALISIS) 

ACTIVITIES : 

enlightenedDiscuss with Dr wan Fahmin regarding yesterday result and Dr Wan guide me to to cross section on all the sample.

enlightenedI use the pricision cutter to cut the sample.

enlightenedGrinding and polish the cross section sample.

enlightenedGet all the microstructure and also composition detail for all sample by using SEM.

 

DATE : 12/7/2018

DAY : THURSDAY

TIME : 8.00AM-5,00PM

TRAVEL : UTM ( FAILURE ANALISIS)

ACTIVITIES :

enlightenedEn Fahmi and En farid arrived at UTM material lab.

enlightenedIntroduce En Fahmi and En farid with my lecture Dr. Wan Fahmi and En ayub.

enlightenedRun the hardness test for all sample.

enlightenedPresent all result to En Fahmi and En Farid.

WEEK 8

DATE : 29/7/2018

DAY : SUNDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedSite visit to continue victaulic clamp project.

     -Continue for next area to observe and identify the condition af the victaulic clamp thats need to be change  because of corrosion.

enlightened Study about types of corrosion which seperated into 2, which is internal corrosion and external corrosion.

     Internal corrosion                                                          

•Sour Water Corrosion                                                        
•Amine Corrosion                                                                                                 
•Cooling Water Corrosion                                        
•HClCorrosion                                                               
•High Temp H2/H2S Corrosion                                    
•HT Sulfudic/ NapthenicAcid Corrosion
•Sulfuric Acid Corrosion
•Acid Sour Water Corrosion
•ATM Storage Tank Bottom (product side)
•CO2 Corrosion
•Erosion
•HF Acid Corrosion
•HT Oxidation
•General Aqueous Corrosion
•Oxygen (O2) Corrosion
•Galvanic Corrosion
•Boiler Water Condensate Corrosion
•Microbiologically Induced Corrosion
•Caustic Corrosion
•Ammonium Chloride Corrosion
•Phenol (Carbonic Acid) Corrosion
•Phosphoric Acid Corrosion
 

DATE : 30/8/2018

DAY : MONDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedAttend TSD Communication session. All staff from technical services department are required to attend that session.

enlightenedThere are a few agenda during that session.

- Opening with Doa Recital
-Safety MomentReview Meeting Agenda
- Review Action Item
-TSD AIR Status Update
-TSD HSE Update
-TSD OPEX Update (June 2018)
-TSD Capability and Development Update
-TSD MI Plan Update
- TSD Management Update
- New Member Introduction:
- PCB Moment
-TSD 5S
- AOB
- New Action Item Register
-Review Meeting Effectiveness & Attendance
-Meeting Adjourned – 
CONTINUE WITH MAKAN-MAKAN FEAST @ PCOGD Canteen
 

DATE : 31/7/2018

DAY :TUESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedReading some notes and slide show about damage machanism that given by En Faizal.

     -There are a lot of damage machanism that occur in the industry such as thermal fatique, brittle fracture and creep.

     -Same goes to corrosion, there were a lot of corrosion type such as cooling water corrosion,CO2 corrosion and errosion.

enlightenedArrange and refiling all the SOE report by following the equipment tag number and plant.

 

DATE : 1/8/2018

DAY : WEDNESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedShort brifing from En Faizal about Petronas Risk Based Inspection (PRBI) and Corrosion Monitoring Program (CMP).

    -PRBI is a method that uses equipment riskand failure modes as a criteria for establishingthe maintenance and inspection plan for each equipment item.

    It is intended to optimize the maintenance & inspection function.

   - Corrosion Management Plan (CMP) is a system approach involving all aspects of human factors to reduce the risk of unpredicted corrosion failures.

enlightenedJoining En Faizal and En farid for corrosion study review discaussion of CMP for derivatives.

enlightenedEn Anuar from operation explain to me a bit about some process flow at derivatives plant.

 

DATE : 2/8/2018

DAY : THURSDAY

TIME : 8.00AM-4.00PM

ACTIVITIES :

enlightenedSite visit for victaulic clamp project.

enlightenedAttend TSD weekly meeting. A few agenda was carried out from the meeting.

    - Item to be register

    - Plants updates by engineer

    -Corrosion program updates

    -Turnaround updates

   -Planner updates

   -Technician updates

   -Management updates.

WEEK 11

DATE: 19/8/2018

DAY: SUNDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedSite visit for visual inspection victaulic clamp project.

enlightenedWriting final report for internship.

 

20/8/2018-21/8/2018

HARI RAYA AIDILADHA LEAVE

22/8/2018-23/8/2018

COMPANY LEAVE FOR AIDILADHA

WEEK 3

WhatsApp Image 2018-06-26 at 8.05.23 AM.jpeg

DATE : 24/6/2018

DAY : SUNDAY

TIME : 8.00 AM- 5.00PM

ACTIVITIES

enlightenedAttending meeting and brifing on Majlis Tilawah Al-Quran Petronas peringkat zon wilayah pantai timur.

enlightenedThe event will be held on :

        Date : 27-28 June 2018

        Day : Wednesday & Thursday

        Time : 8.00 AM-6.00PM

        Place : Kafeteria Petronas Chemicals Derivatives SDN BHD

enlightenedDiscussing a few things related to the preparation of the event

 

DATE : 25/6/2018

DAY : MONDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedPreparation for Majlis Tilawah Al-Quran Petronas

enlightenedHelp on preparing goodies bag, place preparation

 

DATE : 26/6/2018

DAY : TUESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES

enlightenedBrifing about task for Majlis Tilawah Al Quran Petronas

enlightenedManage registration for participants at Singgah Hotel,Kerteh.

 

DATE : 27/6/2018

DAY : WEDNESDAY

TIME : 8.00AM-5.00PM 

ACTIVITIES

enlightenedFirst day of Majlis Tilawah Al-Quran Petronas. I was assigned to manage the registration of participants.

enlightenedI also be assigned to manage food and baverage for participants.

enlightenedThe flow of the event for first day going well. I have a chance to get acquainted with more staffs from others department.

enlightenedIt is a nice experience..smiley

 

DATE : 28/6/2018

DAY : THURSDAY

TIME : 8.00AM-5.00PM 

ACTIVITIES

enlightenedSecond day of Majlis Tilawah Al-Quran Petronas.

enlightenedI run all the task as given. Make sure all the participants register on time to make sure the event run smoothly.

enlightenedI also help on preparation food and baverage for VIP and all participants.

enlightenedLast day of the event, will miss this moment.heart

week 6

DATE : 15/7/2018

DAY : SUNDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedStart writing report of failure analisis valve GA 1111C. The report including all the procedure, result discussion and also reccommadation.

enlightened Site visit to  continue the project on victaulic clamp. Observed the condition of victaulic clamp that undergoes corrosion . All the victaulic clamp that have critical condition needs to report for action.

DATE : 16/7/2018

DAY : MONDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedUpdating turnaraound worklist 2017.

enlightened Continue writing report for failure analysis valve GA1111C. 

DATE : 17/7/2018

DAY : TUESDAY

TIME : 17/7/2018

ACTIVITIES :

enlightenedUpdate report of failure analysis valve GA1111C. After discauss with Dr  Wan Fahmin, there were some correction and addition for the report.

enlightenedSite visit with En Aiman and technician for victaulic clamp project.

DATE : 18/7/2018

DAY : WEDNESDAY

TIME : 8.00 AM-5.00PM

ACTIVITIES :

Reading some materials about Damage Machanism Affecting Fixed Equipment in the Refining Industry.

DATE : 19/7/2018

DAY : THURSDAY

TIME : 8.00AM-4.00PM

ACTIVITIES : 

MC due to health problem.

 

WEEK 9

DATE : 5/8/2018

DAY : SUNDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedRead the related notes about the process flow for Corrosion Management Program (CMP)

         •Corrosion Management Plan (CMP) is a system approach involving all aspects of human factors to reduce the risk of unpredicted corrosion failures.

            •A CMP is concerned with the development, implementation, review and maintenance of the corrosion policy.
 

DATE : 6/8/18

DAY : MONDAY

TIME : 8.00AM-5.00PM

ACTIVITIES : 

enlightened Attend corrosion study review discussion of Corrosion Monitoring Program (CMP) for Derivatives plant. 

          - The main objectives of this study review discaussion is to update all the process discription for every corrosion group.

          - Besides that, from this study review, all team members also discuss about some issue that occur at curtain equipment especially corrosion issue.

 

DATE : 7/8/18

DAY : TUESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

Corrosion study review discussion of Corrosion Monitoring Program (CMP) for Butanol plant.

 

DATE : 8/8/18

DAY : WEDNESDAY

TIME : 8.00AM-5.00PM

ACTIVITIES :

enlightenedRead related notes given by En Faizal about damage machanism .

     Damage mechanisms that are common to a variety of industries including refining and petrochemical,pulp and paper, and fossil utility are covered in American                Petroleum Industry (API).

     The mechanisms are divided into the  following sections:   

      a) Mechanical and Metallurgical Failure
      b) Uniform or Localized Loss of Thickness
      c) High Temperature Corrosion
      d) Environment Assisted Cracking

DATE : 9/8/18

DAY : THURSDAY

TIME : 8.00AM-4.00PM

ACTIVITIES :

enlightenedContinue reading related notes about the damage mechanism and also the fundamental of the damage.

 

 

WEEK12

DATE; 26/8/2018

DAY: SUNDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedCompleting my final report.

enlightenedSubmit final report to my supervisor for revise and approve.

enlightenedSubmit final report to Human Resource department for confidential checking.

 

DATE: 27/8/2018

DAY: MONDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedHelping communitee to prepare lucky draw present for company family day.

enlightenedContinue rearrange and refiling SOE report dosh equipment in TSD library.

 

DATE: 28/8/2018

DAY: TUESDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedRearrange and refailing inspection report.

enlightenedPrepare slide show of Failure Analysis project

 

DATE: 29/8/2018

DAY: WEDNESDAY

TIME: 8.00AM-5.00PM

ACTIVITIES:

enlightenedSubmit all assigment to my supervisor. 

enlightenedupdate log book.

 

DATE: 30/8/2018

DAY: THURSDAY

TIME: 8.00AM-4.00PM

ACTIVITIES:

enlightenedSubmit all PPE to human resource department.

enlightenedFarewell event with all staff TSD

enlightenedLast Day...TQ PCOGD