WEEK 1
DATE : 10/6/2018
DAY : SUNDAY
TIME : 8.00AM-4.00PM
ACTIVITIES
Arrived at Petronas Chemical Derivatives SDN BHD
Safety Video Presentation
Reporting at Human Resource Department with Puan Sarizam
DATE : 11/6/2018
DAY : MONDAY
TIME : 8.00AM-4.00PM
ACTIVITIES
short briefing by Puan Sarizam about all documents that need to be submitted
Checking all the documents from UTM by Puan Sarizam
Reciving all PPE from Puan Sarizam
Reporting to Technical Services Department
DATE : 12/6/2018
DAY : TUESDAY
TIME : 8.00AM-4.00PM
ACTIVITIES
Attend Safety Induction
Pn Rohimah bt Muda introduce me to all manager and stafs at Technical Services Department
Pn Rohimah introduce me to my supervisor which is En Mohamad Fahmi Md Bakery
WEEK 4
DATE : 1/7/2018
DAY : SUNDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Recived notes about Risk Based Inspection (RPI) Method from my supervisor.
Study and understanding about the RPI.
Follow En Farid to butanol plant. En Farid introduce to me the corrosion cuppon that use in the plant to measure the rate of corrosion.
Study and understand about damage machanism.
DATE : 2/7/2018
DAY : MONDAY
TIME : 8.00AM-5.00PM
ACTIVITIES
Follow engineers for inspection in plant. Observed that most of the victolic clamp used in the plant under corrosion.
Learn new things in the plant expecially about type of corrosion undergoes in the plant. Learn about the use of steam trap in the plant.
Continued study about Risk Based Inspection (RBI)
DATE : 3/7/2018
DAY : TUESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Assingment, update the turnaround worklist.
Follow the technicians to the derivatives plant.
Follow En farid to the workshop to cut the valve GA 1111C that undergoes pitting.
DATE : 4/7/2018
DAY : WEDNESDAY
TIME : 8.00AM-5.00PM
ACTIVITIVES :
Joining presentation from MRA INTERNATIONAL SDN BHD.
Follow En Farid to do dye-panetration test on valve GA 1111C that undergoes pitting.
En farid give me task to do failure analisis on the vavlve. After discaussing with my supervisor and En Azhar (bos), we decide to run all the analisis at UTM lab that will be conducted by me.
DATE : 5/7/2018
DAY : THURSDAY
TIME : 8.00AM-4.00PM
ACTIVITIES :
Continue updated the Turnaround worklist.
Discauss with my supervisor about all analisis that need to be run at UTM lab. I also contact Dr wan fahmin to discauss about my task.
WEEK 7
DATE : 22/7/2018
DAY : SUNDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Site visit to Utility plant to perform thermo scanning on incinerator by using thermography scan camera.
-Thermography scan camera is the equipment use to calculate temperature of objects/equipments by using thermal imaging system.
-Thermal cameras detect temperature by recognizing and capturing different levels of infrared light. This light is invisible to the naked eye, but can be felt as heat if the intensity is high enough.
DATE : 23/7/2018
DAY : MONDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Continue reading materials about Risk Based Inspection (RBI)
-Try to understand the PRBI work flow. There were some steps involved which :
- Data gathering and analysis.
-Corrosion study
- Risk analysis overview
- PRBI inspection planning
Prepared slide show for supervisor visit from UTM.
DATE : 24/7/2018
DAY : TUESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Discuss about the slide show that will be presented to my lecture with En Amir.
- some addition and correction had been suggested by En.Amir.
Reading notes about failure machanism.
Re-failing all inspection report in the TSD library.
DATE : 25/7/2018
DAY : WEDNESDAY
TIME : 8.00AM-5.0PM
ACTIVITIES :
Having some discaussion with En Amir regarding my failure analysis report. There were some information need to be added to the report.
En Amir also give me some example of failure analysis report that can be used for references.
Dr. Zainab, my supervisor from UTM arrived here for visit.
After Dr.Zainab watched the safety video, I present to her and also En Amir about my job scope here and also my failure analysis project.
DATE : 26/7/2018
DAY : THURSDAY
TIME : 8.00AM-4.00PM
ACTIVITIES :
Office housekeeping
Refilling all the inspection report in the library.
WEEK 10
DATE: 12/8/2018
DAY: SUNDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Assigned by Pn Farida Aryani to rearrange and refiling PUV Reports Dosh Equipment for Butanol and EOG plant.
Continue reading notes about type of corrosion occur in industry.
DATE: 13/8/2018
DAY: MONDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Attend meeting for Turnaround 2019 (tank) with operation team.
Attend meeting with asset management team for review failure analysis report valve GA1111C.
DATE: 14/8/2018
DAY: TUESDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
From yesterday meeting with asset management team, there were some correction and some new information that need to be add for the failure analysis project on valve GA111C.
Make some correction on failure analysis report.
DATE: 15/8/2018
DAY: WEDNESDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Attend corrosion study review discussion for Derivatives plan.
DATE: 16/8/2018
DAY: THURSDAY
TIME: 8.00AM-4.00PM
ACTIVITIES:
Site visit with En Aiman and technician for victaulic clamp project.
Study about Damage Mechanism.
WEEK 2
DATE : 19/6/2018
DAY : TUESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
simple explanantion from En.Wan Zulfadli about fundamental of heat exchanger in the plant
recive a task from En Wan Zulfadli. Update the inspection matrix for ENT PCOGD turnaround 2017.
I update the number of tubes and the dimension by using the drawings.
DATE : 20/6/2018
DAY : WEDNESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES
Continue the previous work. Learn how to read the drawing and abstract the data needed which is the number of tube and the detail dimension.
DATE : 21/6/2018
DAY : THURSDAY
TIME : 8.00AM-4.00PM
ACTIVITIES :
En Wan Zulfadhli teached me on how to read tube drawing.
Print all the tube drawing for inspection.
WEEK 5
DATE : 8/7/2018
DAY : SUNDAY
TIME : 8.00AM-5.00PM
TRAVEL : UTM ( FAILURE ANALISIS)
ACTIVITIES :
Arrived at UTM Material Lab. Discauss with Dr wan Fahmin and En. ayub about all test that i will run there. Dr wan Fahmin guide me on how to cut the valve for sample preparation.
Start cutting the valve to prepare the sample. Since, the valve is from stainless steel, its took some time to cut.
DATE : 8/7/2018
DAY : MONDAY
TIME : 8.00AM-5.00PM
COMPANY : PETRONAS CHEMICAL DERIVATIVESB SDN BHD
DEPARTMENT : TECHNICAL SERVICES DEPARTMENT (TSD)
TRAVEL : UTM ( FAILURE ANALISIS)
ACTIVITIES :
Prepare the sample .
Grainding , polish , and aging process.
DATE : 10/7/2018
DAY : TUESDAY
TIME : 8.00AM-5.00PM
COMPANY : PETRONAS CHEMICAL DERIVATIVES SDN BHD
TRAVEL : UTM ( FAILURE ANALISIS)
ACTIVITIES :
Get all the microstructure for all sample by using optical microstructure.
Get 3D image of pitting area by using SEM.
DATE : 11/7/2018
DAY : WEDNESDAY
TIME : 8.00AM-5.00PM
TRAVEL : UTM ( FAILURE ANALISIS)
ACTIVITIES :
Discuss with Dr wan Fahmin regarding yesterday result and Dr Wan guide me to to cross section on all the sample.
I use the pricision cutter to cut the sample.
Grinding and polish the cross section sample.
Get all the microstructure and also composition detail for all sample by using SEM.
DATE : 12/7/2018
DAY : THURSDAY
TIME : 8.00AM-5,00PM
TRAVEL : UTM ( FAILURE ANALISIS)
ACTIVITIES :
En Fahmi and En farid arrived at UTM material lab.
Introduce En Fahmi and En farid with my lecture Dr. Wan Fahmi and En ayub.
Run the hardness test for all sample.
Present all result to En Fahmi and En Farid.
WEEK 8
DATE : 29/7/2018
DAY : SUNDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Site visit to continue victaulic clamp project.
-Continue for next area to observe and identify the condition af the victaulic clamp thats need to be change because of corrosion.
Study about types of corrosion which seperated into 2, which is internal corrosion and external corrosion.
Internal corrosion
DATE : 30/8/2018
DAY : MONDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Attend TSD Communication session. All staff from technical services department are required to attend that session.
There are a few agenda during that session.
DATE : 31/7/2018
DAY :TUESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Reading some notes and slide show about damage machanism that given by En Faizal.
-There are a lot of damage machanism that occur in the industry such as thermal fatique, brittle fracture and creep.
-Same goes to corrosion, there were a lot of corrosion type such as cooling water corrosion,CO2 corrosion and errosion.
Arrange and refiling all the SOE report by following the equipment tag number and plant.
DATE : 1/8/2018
DAY : WEDNESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Short brifing from En Faizal about Petronas Risk Based Inspection (PRBI) and Corrosion Monitoring Program (CMP).
-PRBI is a method that uses equipment riskand failure modes as a criteria for establishingthe maintenance and inspection plan for each equipment item.
It is intended to optimize the maintenance & inspection function.
- Corrosion Management Plan (CMP) is a system approach involving all aspects of human factors to reduce the risk of unpredicted corrosion failures.
Joining En Faizal and En farid for corrosion study review discaussion of CMP for derivatives.
En Anuar from operation explain to me a bit about some process flow at derivatives plant.
DATE : 2/8/2018
DAY : THURSDAY
TIME : 8.00AM-4.00PM
ACTIVITIES :
Site visit for victaulic clamp project.
Attend TSD weekly meeting. A few agenda was carried out from the meeting.
- Item to be register
- Plants updates by engineer
-Corrosion program updates
-Turnaround updates
-Planner updates
-Technician updates
-Management updates.
WEEK 11
DATE: 19/8/2018
DAY: SUNDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Site visit for visual inspection victaulic clamp project.
Writing final report for internship.
20/8/2018-21/8/2018
HARI RAYA AIDILADHA LEAVE
22/8/2018-23/8/2018
COMPANY LEAVE FOR AIDILADHA
WEEK 3
DATE : 24/6/2018
DAY : SUNDAY
TIME : 8.00 AM- 5.00PM
ACTIVITIES
Attending meeting and brifing on Majlis Tilawah Al-Quran Petronas peringkat zon wilayah pantai timur.
The event will be held on :
Date : 27-28 June 2018
Day : Wednesday & Thursday
Time : 8.00 AM-6.00PM
Place : Kafeteria Petronas Chemicals Derivatives SDN BHD
Discussing a few things related to the preparation of the event
DATE : 25/6/2018
DAY : MONDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Preparation for Majlis Tilawah Al-Quran Petronas
Help on preparing goodies bag, place preparation
DATE : 26/6/2018
DAY : TUESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES
Brifing about task for Majlis Tilawah Al Quran Petronas
Manage registration for participants at Singgah Hotel,Kerteh.
DATE : 27/6/2018
DAY : WEDNESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES
First day of Majlis Tilawah Al-Quran Petronas. I was assigned to manage the registration of participants.
I also be assigned to manage food and baverage for participants.
The flow of the event for first day going well. I have a chance to get acquainted with more staffs from others department.
It is a nice experience..![]()
DATE : 28/6/2018
DAY : THURSDAY
TIME : 8.00AM-5.00PM
ACTIVITIES
Second day of Majlis Tilawah Al-Quran Petronas.
I run all the task as given. Make sure all the participants register on time to make sure the event run smoothly.
I also help on preparation food and baverage for VIP and all participants.
Last day of the event, will miss this moment.![]()
week 6
DATE : 15/7/2018
DAY : SUNDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Start writing report of failure analisis valve GA 1111C. The report including all the procedure, result discussion and also reccommadation.
Site visit to continue the project on victaulic clamp. Observed the condition of victaulic clamp that undergoes corrosion . All the victaulic clamp that have critical condition needs to report for action.
DATE : 16/7/2018
DAY : MONDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Updating turnaraound worklist 2017.
Continue writing report for failure analysis valve GA1111C.
DATE : 17/7/2018
DAY : TUESDAY
TIME : 17/7/2018
ACTIVITIES :
Update report of failure analysis valve GA1111C. After discauss with Dr Wan Fahmin, there were some correction and addition for the report.
Site visit with En Aiman and technician for victaulic clamp project.
DATE : 18/7/2018
DAY : WEDNESDAY
TIME : 8.00 AM-5.00PM
ACTIVITIES :
Reading some materials about Damage Machanism Affecting Fixed Equipment in the Refining Industry.
DATE : 19/7/2018
DAY : THURSDAY
TIME : 8.00AM-4.00PM
ACTIVITIES :
MC due to health problem.
WEEK 9
DATE : 5/8/2018
DAY : SUNDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Read the related notes about the process flow for Corrosion Management Program (CMP)
•Corrosion Management Plan (CMP) is a system approach involving all aspects of human factors to reduce the risk of unpredicted corrosion failures.
DATE : 6/8/18
DAY : MONDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Attend corrosion study review discussion of Corrosion Monitoring Program (CMP) for Derivatives plant.
- The main objectives of this study review discaussion is to update all the process discription for every corrosion group.
- Besides that, from this study review, all team members also discuss about some issue that occur at curtain equipment especially corrosion issue.
DATE : 7/8/18
DAY : TUESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Corrosion study review discussion of Corrosion Monitoring Program (CMP) for Butanol plant.
DATE : 8/8/18
DAY : WEDNESDAY
TIME : 8.00AM-5.00PM
ACTIVITIES :
Read related notes given by En Faizal about damage machanism .
Damage mechanisms that are common to a variety of industries including refining and petrochemical,pulp and paper, and fossil utility are covered in American Petroleum Industry (API).
The mechanisms are divided into the following sections:
a) Mechanical and Metallurgical Failure
b) Uniform or Localized Loss of Thickness
c) High Temperature Corrosion
d) Environment Assisted Cracking
DATE : 9/8/18
DAY : THURSDAY
TIME : 8.00AM-4.00PM
ACTIVITIES :
Continue reading related notes about the damage mechanism and also the fundamental of the damage.
WEEK12
DATE; 26/8/2018
DAY: SUNDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Completing my final report.
Submit final report to my supervisor for revise and approve.
Submit final report to Human Resource department for confidential checking.
DATE: 27/8/2018
DAY: MONDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Helping communitee to prepare lucky draw present for company family day.
Continue rearrange and refiling SOE report dosh equipment in TSD library.
DATE: 28/8/2018
DAY: TUESDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Rearrange and refailing inspection report.
Prepare slide show of Failure Analysis project
DATE: 29/8/2018
DAY: WEDNESDAY
TIME: 8.00AM-5.00PM
ACTIVITIES:
Submit all assigment to my supervisor.
update log book.
DATE: 30/8/2018
DAY: THURSDAY
TIME: 8.00AM-4.00PM
ACTIVITIES:
Submit all PPE to human resource department.
Farewell event with all staff TSD
Last Day...TQ PCOGD