- Site walk and survey at Sulfur Refinery Unit 1;
- Get to know the instrument equipment need to be install and location of the equipment.
- Comparing the location of equipment in the drawing with the actual location of the equipment at SRU1.
- List of equipment:
- Gas detector
- Toxic gas detector
- Manual call point
- Speaker
- Junction box
- Fire alarm beacon
- Telephone
- Hydrogen sulfide detector (H2S0)
- Learn to sketch mock up support from SRU1 to SRU3 for cable tray.
- Each cable tray need different type of support based on the size of cable tray and its position.
- 2 type of supports were use which are angle bar 50mm x 50mm and c-channel.
- Every support was designed to provide maximum holding strength to cable tray.
- The point to weld between the support and beam structure also important to avoid bending and fracture from occur.
- Before any fabrication works for support start, we need to make a list of all the support at each point
- This list provide us information on the quantity and size of supports at each points to make fabrication works run efficiently.