Network Design Project Task 2 - Initial Design & Preliminary Analysis

In this task, you are to do a preliminary analysis, especially on current and future requirements and devices to be used. In real life, this portion is usually done through meetings and interviews. Once you find this information, you can determine whether the project is feasible.


a) Generate a list of minimum 10 questions (it could be more) to ask the user or to research (the Internet, white papers, journals, etc) with regards to the requirements and other information that is necessary to develop a network plan based on the case study.
b) Find the answers for those questions: either through interviewing the user (your lecturer is a representative) or researching it.
c) Determine the feasibility of the project, explain your reasons.


Deliverables:
• List all of the questions and their answers (minimum 10 questions).
• Explain the feasibility answer and reasoning.
• Due: Week 7 - Sunday 29 November 2020, before 6pm. Submit a PDF file at e-learning.

 **Note: If you find, through your research and interviews that your initial floor plan needs to be updated. You can do so and re-submit the plan.
**Tips: read case study carefully, brainstorm in group about all the questions you have. You will find that some of these questions you know the answer to already, some you need to ask your lecturer/user, some you need to research.