WEEK 2: 26 JULY 2020 -30 JULY 2020

 

DAY

 

DATE

 

ACTIVITY

 

Sunday

 

26/7/2020

  

  •  Study on the construction drawing; overall layout and compressor piping details
  • Doing some research about compressed air dryer, compressed air filter and air receiver tank

 

Monday

 

27/7/2020

 

  • Measure the dimensions for all component in the air compressor; compressed air dryer, compressed air filter and air receiver tank
  • Compare the measurement result with the measurement specification on the tender and state the reason if it have any different.

 

 

Tuesday

 

28/7/2020

 

 

  • Measuring and taking all the detail needed from air compressed system for applying the approval from Department of Occupational System and Health Malaysia (DOSH)
  • Listing all the technical specification data for air compressed system; working pressure, free air delivery rate, weight, noise level and etc.

  

 

Wednesday

 

29/7/2020

 

  • Draw floor plan for air compressor system with the detail measurement for applying the approval from Department of Occupational System and Health Malaysia (DOSH)

 

Thursday

 

30/7/2020

 

  • Making component analysis for air compressed system:

         1. Air receiver tank

             a) Stress and strain

             b) Buckling

             c) Welding

          2. Pipe

              a) Stress and strain