Monday : 30/07/2018
Today , we gonna make a presentation on everyone task about the new helicopter that needed to be modified. My task for today presentation is to make a structural analysis on installation of RC6000, Skynode s200 and GPS Antenna.
the things that i have to present is :
- The installation method.
- The Fabricated parts
- Design and drawing
- Location at the helicopter
- Strength and analysis
The presentation starts at 2 pm. Because of the absents of my partner Hafiz on that day, i have to do it alone. Things that i have present is the design of fabricated parts, the location on the helicopter, and lastly the strength analysis. The presentation went well and smoothly.
Tuesday : 31/07/2018
Doing the Question DOA and Air law in Malaysia and regulation that have been given by Mr. Luqman
Wednesday : 01/08/2018
Had a leave for today because of Family matter.
Thursday : 02/08/2018
Finish the detailed on Owner's Plate. The drawing is given to kak addah for inspection and after that ready to fabricate.
Continue on completing the Modification document for Owner's Plate.
Friday : 03/08/2018
Continue doing the modification document for owner's plate. doing the material parts and finalize it.
Starts doing the modification document for Skynode, Rc6000 and GPS Antenna